[1] |
GUO Haizhu, ZHANG Jian, SHI Xiaowei.
Crucial Construction Technologies for Shenzhen Metro
Dayun Hub Station
[J]. Tunnel Construction, 2023, 43(S1): 451-456.
|
[2] |
ZHANG Xiaodong, WU Quande, FAN Yongzai, LIU Dagang, WANG Yan, LUO Jia.
Mechanized Rapid Operation of Complete Sets of
Equipment in Large CrossSection Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 416-424.
|
[3] |
YANG Wentao, LIU Xiabing, HE Shaohui, ZHANG Xiaohua, WANG Jianjun.
Construction Method and Excavation Response of ShallowBuried SuperLargeSpan
FourTrack HighSpeed Railway
Tunnel: a Case
Study of Xiabeishan No. 1 Tunnel on HangzhouTaizhou
HighSpeed Railway
[J]. Tunnel Construction, 2022, 42(S2): 381-388.
|
[4] |
ZHANG Zaichen, LIN Congmou, LI Jiasheng, DONG Yi, SHEN Yawen.
Development Status and Prospect of Highway Tunnel
Rehabilitation and Expansion in China
[J]. Tunnel Construction, 2022, 42(4): 570-585.
|
[5] |
LEI Shengxiang, HUANG Shuanglin.
Disturbance Mechanism and Control Technology of
Underground Space Crossing underneath Buildings
(Structures)
[J]. Tunnel Construction, 2022, 42(1): 1-8.
|
[6] |
LIN Kefu, XIANG Yanyong.
Numerical Modeling and Parametric Optimization of
ThreeBench Construction
Method for Zhengpantai Deep Tunnel in WaterRich Rocks
[J]. Tunnel Construction, 2021, 41(S1): 199-.
|
[7] |
PAN Wentao, WU Fangyin, HE Chuan, LIU Yang, XIE Jinchi, KOU Hao, YANG Wenbo, ZENG Jie, YANG Song.
Construction Methods and Asymmetric Design
Optimization for ShallowBuried
Tunnels Subjected to Unsymmetrical Loads
[J]. Tunnel Construction, 2021, 41(S1): 352-.
|
[8] |
LIU Li, ZHANG Ping, WANG Huanlong, YANG Changyu.
Design and Analysis of No.1 Shaft in Gaoligongshan
Tunnel
[J]. Tunnel Construction, 2020, 40(S2): 188-195.
|
[9] |
HUANG Weike, CHEN Jiabao, ZHANG Libin, MA Jianyun.
Mechanized Construction Technology for Large Crosssection Longchang
Highway Tunnel in Grade Ⅳ Surrounding Rock
[J]. Tunnel Construction, 2020, 40(8): 1203-1210.
|
[10] |
WU Wei, QIN Weihua, LUO Fujun.
Economic Analysis on Large Crosssectional
Mechanized Construction of Soft
Rock Railway Tunnel
[J]. Tunnel Construction, 2020, 40(12): 1775-1780.
|
[11] |
SONG Yi.
Selection of Design Schemes of Su′ai
Subsea Shield Tunnel in Shantou
[J]. Tunnel Construction, 2020, 40(10): 1391-1398.
|
[12] |
TANG Xiaojie, SHI Lei, CHEN Jiawei, PENG Zhen, LI Yuanhai.
Analysis of Surrounding Rock Deformation Control of Largespan Metro Tunnel Crossing Fault by Combined Tunneling Method
[J]. Tunnel Construction, 2019, 39(2): 227-239.
|
[13] |
LIN Gang, SHI Xuantao, CHEN Jun .
Application and Practice of Double-shield TBM to Qingdao Rail Transit Tunnel
[J]. Tunnel Construction, 2019, 39(12): 2020-.
|
[14] |
GUO Chenggang, SUN Jie, YANG Yuanhuai,YU Long, CHEN Wei, CHEN Xingpei, WU Yonghong.
Research on Design and Construction Method of Underground Interchange Tunnel in Hutiaoxia of Shangrila to Lijiang Highway
[J]. Tunnel Construction, 2018, 38(S2): 232-238.
|
[15] |
WANG Zhijian.
Research on Key Technology of Large Crosssectional Mechanized Construction of ZhengzhouWanzhou Highspeed Railway Tunnel
[J]. Tunnel Construction, 2018, 38(8): 1257-1270.
|