[1] |
LI Kejun, LI Sanhua, CHEN Miaolin, YAO Xuejun, LIU Zhihui, DENG Minya, GAO Long.
Modeling Analysis of MechanicalHydraulic
Coupling of Boom Luffing System
of Concrete Wet Spraying Machine
[J]. Tunnel Construction, 2023, 43(5): 879-886.
|
[2] |
HU Guangjing, HUANG Dawei, JIANG Hao, ZHAN Tao, YUAN Yuefeng.
Analysis for Influence Factors and Control of Shield
Advance Speed Based on Field
Measurement Data
[J]. Tunnel Construction, 2022, 42(S2): 189-196.
|
[3] |
JIN Wenliang XU Guoping, GUO Yawei, ZHU Yaoyu, SONG Shenyou, WANG Qiang, HUANG Qingfei.
Experimental Research and Design Principle Analysis on
Push Type Final
Joint of Immersed Tunnel in ShenzhenZhongshan Link
[J]. Tunnel Construction, 2022, 42(S2): 305-311.
|
[4] |
ZHOU Yaping, JIANG Haibo.
Research on InSitu Stress Characteristics of
DeepBuried HighInSitu Hydraulic Tunnel and Prediction of
Rockburst Brittle Failure Depth
[J]. Tunnel Construction, 2022, 42(S1): 321-330.
|
[5] |
SHI Changhong, LING Songyao, CAO Yanfu, GUO Kai, WANG Gangfeng.
Design and Application of Hydraulic Formwork for LongSection
and LargeTonnage
Prefabricated Utility Tunnel
[J]. Tunnel Construction, 2022, 42(6): 1071-1076.
|
[6] |
LYU Jianle.
Comparison and Analysis of Tunnel Boring Machine
Overcutting Methods
[J]. Tunnel Construction, 2021, 41(6): 1058-1064.
|
[7] |
ZHU Xiaozao.
Analysis of EPB Shield Advancing Speed Control in
Composite Strata: a Case Study on Tunnel Project of
HJZQ2 Bid of Newlybuilt HengqinZhuhai Airport Section
[J]. Tunnel Construction, 2020, 40(S1): 107-114.
|
[8] |
WANG Yijun, PAN Weihua, YAO Wenhui, ZHANG Yongming, JIA Yuedi.
Experimental Study on New Hydraulic Blasting Dust
Removal Technology
[J]. Tunnel Construction, 2020, 40(9): 1360-1367.
|
[9] |
ZHONG Zhiquan.
Separate Launching Technology of EPB Shield in Narrow
Space: a
Case Study on Shield Tunnel of Singapore Metro C715 Project
[J]. Tunnel Construction, 2020, 40(8): 1197-1202.
|
[10] |
LI Jie, ZHANG Xin, MA Chao, YANG Long, GUO Jingbo.
Analysis and Experimental Research on Synchronous
Performance of Segment Erector Lifting System
[J]. Tunnel Construction, 2020, 40(7): 1072-1080.
|
[11] |
ZHU Pengjin, ZHAO Kanglin, XIAO Lixing.
Development and Application of Equipment for Lateral
Moving and Advancing without Load of TBM
[J]. Tunnel Construction, 2020, 40(3): 417-425.
|
[12] |
ZHU Jinbo, WANG Cong.
Design and Application Technology of Fullsection
Large Hydraulic Formwork Trolley for Immersed Tunnel
Segment Prefabrication
[J]. Tunnel Construction, 2020, 40(12): 1817-1823.
|
[13] |
LI Zhijun, FANG Youliang, XIAO Gang, LAI Wenhui, QU Yong, FU Jinyang, XU Zan.
Ground Deformation Characteristics of Water-rich Gravel Stratum during EPB Shield Stop
[J]. Tunnel Construction, 2020, 40(1): 106-113.
|
[14] |
LIAO Jun, XIAO Bo, WANG Daoliang, SHI Bo.
Discussion on Some Issues in Prevention and Treatment Design for Tunnel Crossing Debris Flow Gully
[J]. Tunnel Construction, 2020, 40(1): 75-82.
|
[15] |
YU Peng, LIANG Gaofeng.
Study of Structure Mismatch between Jumbo Arm Positioning System and Hydraulic Arm
[J]. Tunnel Construction, 2019, 39(S1): 445-450.
|