| [1] |
CHEN Weile, WANG Yuanqing, SUN Chunhua, ZHANG Qinbo, LI Xiaoming, CHEN Lin.
Structural Selection and Application of Immersed Tube Tunnel Elements Based on Entropy Weight Method-TOPSIS Approach
[J]. Tunnel Construction, 2025, 45(12): 2343-2351.
|
| [2] |
HUANG Shuhua, ZHENG Zhenji, SHENG Jian, XIE Dianyan, ZHANG Liang, CHEN Xiangsheng, SU Dong.
Comparative Study on Construction Schemes for Connecting Channel of Underwater Super-Large Diameter Shield Tunnel: A Case Study on Haizhuwan Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2024, 44(S1): 408-417.
|
| [3] |
YUAN Yueming, LIU Hongliang, YAN Zongwei, ZHANG Ziqi, GUO Peifan, ZHANG Zirui, YANG Guang.
Three-Dimensional Laser Tunnel Crack Detection Based on Federated Weighted Learning Algorithm
[J]. Tunnel Construction, 2024, 44(S1): 478-484.
|
| [4] |
WEI Lixin, YANG Chunshan, LIU Liying, FU Dongliang.
General Design Scheme of Haizhu Bay RiverCrossing
Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 359-368.
|
| [5] |
PEI Zhenzhen, WANG Yanan.
Economic Comparison of Dimension of Inclined Shaft
CrossSection and Ventilation Pipe of DoubleTube Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 213-219.
|
| [6] |
CHENG Yipin, CHEN Weile, SONG Shenyou, SUN Haifeng, SUO Xuhong.
Calibration Accuracy Comparison between Floating State
of Measuring
Tower and Coordinate Bottom for ImmersedTube
Installation
in
ShenzhenZhongshan Link
[J]. Tunnel Construction, 2021, 41(8): 1399-.
|
| [7] |
XING Bo, FENG Huanhuan.
Suggestions and Considerations on Equipment Selection
for Constructing Sichuan-Tibet
Railway Tunnels at High Altitudes
[J]. Tunnel Construction, 2021, 41(10): 1644-1653.
|
| [8] |
LIU Ke, LI Yajun, WANG Qingchuan, LIU Xiongwei, SHANG Hanchun.
Route Selection Scheme Research on BadongXiangluping
Tunnel Group on ZhengzhouWanzhou
Railway in Karst Geology
[J]. Tunnel Construction, 2021, 41(10): 1771-1780.
|
| [9] |
DENG Wenwu, ZHANG Jiao.
Comparison and Analysis of Structure Form of Sky
Train in Tunnel at Mountainous Areas
[J]. Tunnel Construction, 2020, 40(S1): 266-269.
|
| [10] |
WANG Liyong.
Analysis of Key Factors Affecting Construction Cost of
Wuhan Metro Project
[J]. Tunnel Construction, 2020, 40(S1): 51-56.
|
| [11] |
ZHANG Yaoping.
High-speed Railway Route Scheme of Submarine Vacuum
Tube from Yantai to Dalian
[J]. Tunnel Construction, 2020, 40(3): 299-305.
|
| [12] |
YUE Bin, XIONG Tianfang.
Study on Design of Segment Ring Width, Segment
Partition and Bolt Number of Tianjin Municipal Drainage
Shield Tunnel
[J]. Tunnel Construction, 2020, 40(11): 1625-1633.
|
| [13] |
SONG Yi.
Selection of Design Schemes of Su′ai
Subsea Shield Tunnel in Shantou
[J]. Tunnel Construction, 2020, 40(10): 1391-1398.
|
| [14] |
GUO Zhijie, HE Jijun, ZHANG Cancheng, HU Xiaoqi, YU Zhihua.
Comparison and Selection of Ventilation Schemes for Jinmen Extralong Highway Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 321-326.
|
| [15] |
TANG Rui, XIANG Long, WANG Jun, TANG Xie.
Overall Design Scheme for Zheduoshan Tunnel in Both Longterm and Shortterm Perspectives
[J]. Tunnel Construction, 2019, 39(S1): 340-345.
|