| [1] |
YANG Jian, WU Jiaming, DAI Linfabao, TIAN Li, LIU Xiuguo, SUN Jie, SUN Wenhao.
Deep-Learning-Based Intelligent Design Method and Application of Lining for High-Speed Railway Tunnels Using Mining Method
[J]. Tunnel Construction, 2025, 45(9): 1742-1755.
|
| [2] |
SONG Chaoye, LIU Wenjun, HE Weiguo, YU Yong, LYU Shuqing.
Key Technologies for Design of Pearl River Estuary Subsea Tunnel of Shenzhen-Jiangmen Railway
[J]. Tunnel Construction, 2025, 45(8): 1561-1576.
|
| [3] |
GUO Xiansuo.
Construction Technology of Prefabricated Inverted Arch in Single-Track
Railway Tunnels by Mining Method
[J]. Tunnel Construction, 2025, 45(3): 623-635.
|
| [4] |
HUANG Shuhua, ZHENG Zhenji, SHENG Jian, XIE Dianyan, ZHANG Liang, CHEN Xiangsheng, SU Dong.
Comparative Study on Construction Schemes for Connecting Channel of Underwater Super-Large Diameter Shield Tunnel: A Case Study on Haizhuwan Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2024, 44(S1): 408-417.
|
| [5] |
WANG Song, XIE Yunlai, QING Weichen, YANG Changyu, WANG Jianhong, YANG Yi.
Design of Prefabricated Lining Structure at Tunnel
Arch Constructed with Mining Method
[J]. Tunnel Construction, 2022, 42(S1): 360-368.
|
| [6] |
CHU Kai, HE Weiguo, YU Yong.
Route Scheme of Pearl River Estuary Tunnel Project of ShenzhenJiangmen Railway
[J]. Tunnel Construction, 2022, 42(9): 1597-1604.
|
| [7] |
DAI Xin, HE Weiguo, WANG Dongwei, LYU Qingsong, YU Yong.
Drainage Design of a DeepBuried
Subsea Tunnel Using Mining Method: a Case Study of Pearl River Estuary Railway Tunnel
[J]. Tunnel Construction, 2022, 42(4): 695-702.
|
| [8] |
SUN Feixiang, PENG Zhengyong, ZHOU Jianjun, YANG Zhenxing, ZHANG Jichao, TANG Zongxiong.
Study on Breakthrough Modes in Docking Section between
Shield and Mined Sections Considering Rock Mass Classification
[J]. Tunnel Construction, 2021, 41(8): 1336-.
|
| [9] |
QIANG Jian.
Development and Research Direction of Utility Tunnels
Constructed by
Mining Method
[J]. Tunnel Construction, 2021, 41(5): 764-771.
|
| [10] |
ZHANG Jinwei, LUO Furong, TONG Lihong, YANG Binbin, XU Qian.
Study on Prefabricated Lining Structure Design of a Metro
Tunnel Constructed
by Mining Method
[J]. Tunnel Construction, 2021, 41(5): 822-830.
|
| [11] |
GUO Chun, SONG Junxiu, WANG Xin, CHENG Jianghao.
Research Status and Development of Dust Control
Technology in Tunnel Constructed by Mining Method
[J]. Tunnel Construction, 2020, 40(S1): 68-74.
|
| [12] |
LUO Wenjing, ZOU Chenglu.
Key Technologies and Numerical Analysis of Metro Station by Cut-and-cover and Mining Method at Semi-diagenetic Stratum in Nanning
[J]. Tunnel Construction, 2020, 40(5): 727-734.
|
| [13] |
CHEN Xiaoyang, XU Tao, ZHANG Hao, ZHANG Feng, GUO Chafa.
Research and Application of Improved Tube Well Dewatering Technology
[J]. Tunnel Construction, 2020, 40(3): 411-416.
|
| [14] |
WANG Shuaishuai, CAI Tangtao, WU Chun, XU Qianshun, GAO Bo.
Demolition of Temporary Support and Rapid Construction
Technology of Secondary Lining Structure in Super Large Crosssection Mined Cavern: a Case Study on
Shenzhen Foreign Languages School Station on Shenzhen
Metro Line 8
[J]. Tunnel Construction, 2020, 40(10): 1525-1532.
|
| [15] |
ZHANG Jin.
Crosssection Optimization of Mining
Tunnel of Metro Station by CutandCover and Mining Method: a Case Study on
Qingxiushan Station on Nanning Metro Line No. 3
[J]. Tunnel Construction, 2020, 40(10): 1480-1487.
|