[1] |
GENG Tianshuang, ZHANG Jing, ZHAO Jiling, YANG Ping, HE Wenlong.
Metro Jet System and Horizontal Freezing Construction
at Zhongsheng Station of Nanjing
Metro Line 7 Closely Crossing Underneath an Operation Station
[J]. Tunnel Construction, 2024, 44(1): 172-180.
|
[2] |
SHAN Lianjun, GUO Jianmin, NI Pengpeng, LI Jianfeng, MA Huihuan, SUN Wei.
Review on Development of Joint Type and Deformation
Mechanism of
Immersed Tunnel
[J]. Tunnel Construction, 2023, 43(S1): 14-24.
|
[3] |
LI Pengfei, LI Ze, GE Chenhe, GUO Fei.
Deformation Characteristics and Redundancy Analysis of
Deep Foundation Pit Excavation in Metro Station Using
Covering TopDown Method in Sandy Stratum
[J]. Tunnel Construction, 2023, 43(S1): 98-108.
|
[4] |
CHEN Kunyang, CHEN Xiangsheng, WANG Lei, YANG Wensheng, WU Huanyu, DUAN Huanbo.
Greenhouse Gas Emissions of Open
[J]. Tunnel Construction, 2023, 43(S1): 189-197.
|
[5] |
LIU Xu, WU Honggang, GUAN Wei, SUN Hao.
Applicability of Uneven Convergence Mode in Soft Rock
Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 240-247.
|
[6] |
LIU Dun .
Application of Shield Receiving in Ultra-Deep
Foundation Pit Without Main Structure:
A Case Study of Dashadong Station of Gungzhou Metro Line 7
[J]. Tunnel Construction, 2023, 43(S1): 506-513.
|
[7] |
HUANG Lei, GONG Zhenyu, PU Heng, YANG Zebin, WANG Shuying.
Rock Breaking Technology and Primary Support
Settlement Control of ShallowBuried
Tunnels with RichWater in UpperSoft and LowerHard Strata
[J]. Tunnel Construction, 2023, 43(S1): 499-505.
|
[8] |
ZHOU Zhihui, SUN Bo.
Research on Key Technology of Prefabricated Metro -Station
with Internal Support System
[J]. Tunnel Construction, 2023, 43(S1): 464-472.
|
[9] |
GUO Haizhu, ZHANG Jian, SHI Xiaowei.
Crucial Construction Technologies for Shenzhen Metro
Dayun Hub Station
[J]. Tunnel Construction, 2023, 43(S1): 451-456.
|
[10] |
QIN Zhengyang, AN Bin.
Mounting Technology for Steel Brace in Deep Foundation
Pit of Metro Station
Constructed by Semi-Cover Excavation Method: A Case Study
on Liuyanjing Station of Metro Line 3 in
Nanchang, China
[J]. Tunnel Construction, 2023, 43(S1): 407-415.
|
[11] |
CHEN Xiangsheng, WANG Lei, YANG Wensheng, SU Dong, WU Yongzhao, LIU Shuya.
Construction Scheme and Mechanical Properties of a
Prefabricated Metro Station Constructed by TwinTube Closely Spaced PipeJacking Method
[J]. Tunnel Construction, 2023, 43(7): 1089-1098.
|
[12] |
HUANG Yanjun, YUAN Shan, WANG Cong, CHEN Baoguo, ZHANG Yanlin.
Theoretical Analysis of Displacement and Axial Force
in Support Structures During Dynamic Adjustment of
Internal Support Systems in Foundation Pits
[J]. Tunnel Construction, 2023, 43(5): 761-769.
|
[13] |
LIANG Lian, FANG Tao, FANG Lijian, XIAO Yandong.
Experimental Study on Deformation Law of Stratum
Caused by Tunnel Construction
Based on Particle Image Velocimetry Technique
[J]. Tunnel Construction, 2023, 43(4): 625-633.
|
[14] |
HU Min, PEI Liefeng, WU Bingjian, SUN Junchao, LU Jing.
Current Situation and Prospect of Shield Automatic
Driving Technology
[J]. Tunnel Construction, 2023, 43(3): 383-391.
|
[15] |
DONG Lipeng, YANG Shannan, LIU Zhiwei.
Research and Application of PipeRoof
Support Technology for Mined Metro Stations with UltraShallowBuried PipeRoof Cover Method:
a
Case Study of Ping′anli Station of Beijing Metro Line
19
[J]. Tunnel Construction, 2023, 43(2): 305-315.
|