[1] |
YI Guoliang, CHEN Kui, LU Gaoming, ZHOU Jianjun, FAN Wenchao.
Progress in Shield Tunneling Technology for Urban Underground
Space in China
[J]. Tunnel Construction, 2024, 44(1): 1-20.
|
[2] |
GENG Tianshuang, ZHANG Jing, ZHAO Jiling, YANG Ping, HE Wenlong.
Metro Jet System and Horizontal Freezing Construction
at Zhongsheng Station of Nanjing
Metro Line 7 Closely Crossing Underneath an Operation Station
[J]. Tunnel Construction, 2024, 44(1): 172-180.
|
[3] |
CHEN Kunyang, CHEN Xiangsheng, WANG Lei, YANG Wensheng, WU Huanyu, DUAN Huanbo.
Greenhouse Gas Emissions of Open
[J]. Tunnel Construction, 2023, 43(S1): 189-197.
|
[4] |
LIU Dun .
Application of Shield Receiving in Ultra-Deep
Foundation Pit Without Main Structure:
A Case Study of Dashadong Station of Gungzhou Metro Line 7
[J]. Tunnel Construction, 2023, 43(S1): 506-513.
|
[5] |
ZHOU Zhihui, SUN Bo.
Research on Key Technology of Prefabricated Metro -Station
with Internal Support System
[J]. Tunnel Construction, 2023, 43(S1): 464-472.
|
[6] |
GUO Haizhu, ZHANG Jian, SHI Xiaowei.
Crucial Construction Technologies for Shenzhen Metro
Dayun Hub Station
[J]. Tunnel Construction, 2023, 43(S1): 451-456.
|
[7] |
LYU Minghao, WEI Chenglin, TANG Xinwei.
Application of LargeDiameter
Metro Jet System in Shield Crossing Underground
Passage with Low Clearance: A Case Study of Airport T1~T2 Section on XintangBaiyun AirportGuangzhou North Railway Station of Intercity
Railway in Pearl River Delta
[J]. Tunnel Construction, 2023, 43(S1): 434-442.
|
[8] |
MA Gang, KANG Zuo, GAO Huyan, YU Wenlong, KANG Jiawei.
Analysis on Safety Risk of Urban Metro Tunnel
Construction in Saturated Soft Loess Stratum and Its Countermeasures
[J]. Tunnel Construction, 2023, 43(S1): 425-433.
|
[9] |
QIN Zhengyang, AN Bin.
Mounting Technology for Steel Brace in Deep Foundation
Pit of Metro Station
Constructed by Semi-Cover Excavation Method: A Case Study
on Liuyanjing Station of Metro Line 3 in
Nanchang, China
[J]. Tunnel Construction, 2023, 43(S1): 407-415.
|
[10] |
CHEN Xiangsheng, WANG Lei, YANG Wensheng, SU Dong, WU Yongzhao, LIU Shuya.
Construction Scheme and Mechanical Properties of a
Prefabricated Metro Station Constructed by TwinTube Closely Spaced PipeJacking Method
[J]. Tunnel Construction, 2023, 43(7): 1089-1098.
|
[11] |
PAN Haize, LI Gen, CHEN Yixi, LUO Zhenhua, HAN Jianqiang.
Critical Factors Influencing Safety Vulnerability of
Metro Shield Tunneling Based
on Structural Equation ModelImportancePerformance
Analysis
[J]. Tunnel Construction, 2023, 43(6): 936-947.
|
[12] |
WANG Changhong, ZHANG Haidong, DONG Jihan, LI Fei, HE Hongyuan.
HydroThermoMechanical
Coupling Study on Freezing Method for Metro Connecting
Gallery in Saturated Silt Sand Strata in Nantong, China
[J]. Tunnel Construction, 2023, 43(6): 948-958.
|
[13] |
SHI Leilei, GUO Caixia, WANG Yichen, KONG Heng.
Analysis Method for Metro Monitoring Data Using Modified
Statistics Process Control
[J]. Tunnel Construction, 2023, 43(6): 1027-1034.
|
[14] |
DONG Lipeng, YANG Shannan, LIU Zhiwei.
Research and Application of PipeRoof
Support Technology for Mined Metro Stations with UltraShallowBuried PipeRoof Cover Method:
a
Case Study of Ping′anli Station of Beijing Metro Line
19
[J]. Tunnel Construction, 2023, 43(2): 305-315.
|
[15] |
WANG Shouhui, YANG Xing, JIANG Yusheng, LIU Quanwei, ZHAO Jizeng, ZHU Zhijing, SHAO Changzhi, TAN Zhuolin, YANG Zhiyong.
Synchronous Backfilling Technology for Gravel and
Bottom Grouting Behind Double-Shield Tunnel Boring Machine
Segment: A Case Study of a
Section
of Qingdao Metro Line 6
[J]. Tunnel Construction, 2023, 43(11): 1954-1963.
|