[1] |
LIU Shaopeng, DENG Bin, CAO Yingfeng, XIA Fengyong.
Geographic Information System + Building Information
Modeling-Based Forward
Design Method: Applications in Bridges and Tunnels
[J]. Tunnel Construction, 2023, 43(4): 674-689.
|
[2] |
ZHONG Qiaoqiao, YUAN Hong, DENG Hai, DENG Xin, WANG Jianhong.
Literature Review of Flood Prevention Design Methods
for Underground Space in Japan
[J]. Tunnel Construction, 2023, 43(2): 217-227.
|
[3] |
SUN Daoguang, LI Jin, LI Bo, WANG Chen.
Key Technologies of Integrated Design for MultiSpeciality
of Metro Station with Prefabricated Underground
Structure
[J]. Tunnel Construction, 2022, 42(S2): 312-319.
|
[4] |
WANG Jinfeng, XIE Qiyong, XU Jinbin, LI Jieyuan, WANG Pan.
Micro Settlement Control Technology for Shield Tunnel
Closely Crossing Underneath Existing Metro Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 372-380.
|
[5] |
ZHU Yalin, ZHANG Bin, SHI Ming, LIU Jianjun, WANG Yixian.
Influence of Partitioned Excavation of Deep Narrow
Foundation Pit on Settlement of Neighboring Buildings
in Soft Soil Area
[J]. Tunnel Construction, 2022, 42(S1): 166-173.
|
[6] |
LIU Zhitao, ZHANG Jingjing, WANG Lichuan, LIU Xupeng, HUA Wei.
Construction Control Technology of Shield Tunneling
underneath BrickandConcrete
Residential Buildings: a Case Study of Phase Ⅲ Project of Hefei Rail Transit Line 1
[J]. Tunnel Construction, 2022, 42(S1): 427-432.
|
[7] |
GUO Haiyang, LIU Changyong, LI Bingde, BAO Xianfeng, WANG Yantao.
Processing Quality Inspection and Installation
Accuracy Prediction of Prefabricated
Metro Components
[J]. Tunnel Construction, 2022, 42(3): 437-444.
|
[8] |
DENG Shengjun, HE Yang, CHEN Haolin, ZHOU Feng, ZHU Rui, SHI Wenhao, WANG Yuan, MA Qianli.
RealTime Dynamic Simulation and
Deformation Prediction of Shield Tunneling through Soft Soil Layer in Complex
Environment:
a
Case Study of Suzhou Metro Line S1 Shield Section
[J]. Tunnel Construction, 2022, 42(12): 2024-2035.
|
[9] |
XU Riqing, GUO Zhong, DING Pan, CHEN Wenxiang, LI Junhu, ZHU Huangding, ZHANG Bailing.
Overview on Influence of Vibration Induced by Shield Construction on Adjacent Buildings and Its Control Measures
[J]. Tunnel Construction, 2021, 41(S2): 14-21.
|
[10] |
SHI Bo, LI Ke.
Influence Zoning of Buildings Adjacent to Tunnel and
Engineering Countermeasures
[J]. Tunnel Construction, 2021, 41(S2): 230-235.
|
[11] |
YU Shangyu.
Forward Design and Application of Building Information
Modeling in Shenzhen
Huangmugang Comprehensive Transportation Hub Project
[J]. Tunnel Construction, 2021, 41(S2): 390-397.
|
[12] |
TU Zhiyi, CHEN Tao.
Research and Application of Underpinning Technology of
Pile Foundation by Longitudinal WallBeam in Mined Tunnel
[J]. Tunnel Construction, 2021, 41(S2): 398-407.
|
[13] |
WANG Xibao, YUAN Song, WEI Jicheng, ZHANG Sheng.
Determination and Flexible Application of Building Boundary of Opencut/Shed Tunnels of Highway
[J]. Tunnel Construction, 2021, 41(S2): 408-412.
|
[14] |
SUN Guowen, LI Yong, FU Gongyun, LYU Shuqing, SHI Kai, CAI Zhen.
Application of Building Information Modeling in Design
of Cavern Project with Tree Topology Structure
[J]. Tunnel Construction, 2021, 41(S2): 452-461.
|
[15] |
WANG Yun.
Key Construction Technology of Tunnel Boring Machine
Crossing underneath Existing Building in Composite Rock
Strata: a Case Study of Central Park East StationCongyansi Station on Chongqing Rail Transit Line 9
[J]. Tunnel Construction, 2021, 41(S2): 520-526.
|