| [1] |
LIU Huan, ZHAO Wen, LI Jialong, BAI Qian, WANG Xin, YANG Qinghai.
Compression and Shear Properties of Foam-Conditioned Soil for Earth Pressure Balance Shield in a Fully Weathered Granite Stratum
[J]. Tunnel Construction, 2026, 46(3): 620-630.
|
| [2] |
WANG Yanning, LI Taikai, MIN Xinhao.
State of the Art of Machine Learning in Tunnel Engineering
[J]. Tunnel Construction, 2026, 46(2): 233-245.
|
| [3] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [4] |
ZHAO Jingwei, LI Haoqi, SUN Yu.
Evaluation of Spatial Integration in Metro Station Areas From Perspective of Urban Renewal: A Case Study of Shinan District, Qingdao, China
[J]. Tunnel Construction, 2026, 46(1): 46-59.
|
| [5] |
LEI Mingfeng, LI Changwan, YANG Pengliang, JIA Chaojun, LI Chuitian.
Impact Zoning of Construction Disturbance on Nearby Existing Damaged BuildingsInduced by Foundation Pit of a Metro Station Based on Extended Finite Element Method and Response Surface Method
[J]. Tunnel Construction, 2026, 46(1): 69-79.
|
| [6] |
BAI Qian, LI Zheng, ZHAO Wen, PENG Zhipeng.
Impact of Small Pipe-Roof-Top Slab Method Support Parameters in Metro Stations on Surface Settlement
[J]. Tunnel Construction, 2026, 46(1): 103-112.
|
| [7] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [8] |
ZHANG Zhiguo, WAN Qimeng, LI Junjie, NI Yin, JIA Haoran, WEI Jian.
Impact of Deep Foundation Pit Excavation on Existing Metro Stations in Rheological Soft Strata and Reinforcement Effects: A Case Study of Shanghai Jinqiao Metro Over-Track Project
[J]. Tunnel Construction, 2025, 45(S2): 97-106.
|
| [9] |
FANG Qian, YOU Qizhao, WANG Jianchen, WANG Gan, KE Chengjian, RU Zhenhua.
Deformation of Existing Metro Structures Induced by Newly Built Metro Undercrossing: A Case Study of 18 Newly Built Metro Projects in Beijing
[J]. Tunnel Construction, 2025, 45(S2): 125-139.
|
| [10] |
DENG Shaojun.
Innovative Design of Side Platform Stations on
Underground First Floor of Metros and Associated Issues: A
Case Study of Industrial Park Railway Station of Suzhou Metro Line 8
[J]. Tunnel Construction, 2025, 45(S1): 217-225.
|
| [11] |
XU Youjun, JIN Chenyu, ZHANG Chao, WANG Nan.
Optimization of Counteracting Soil of Parameters a Deep Foundation Pit Close to an Existing Station in Hohhot, China
[J]. Tunnel Construction, 2025, 45(9): 1728-1741.
|
| [12] |
LI Peng, WANG Quansheng, YU Changyi, FU Zeng.
Construction Technology of Metro Stations Using Triple-Circular Shield
[J]. Tunnel Construction, 2025, 45(9): 1756-1767.
|
| [13] |
XU Huaguo.
Experimental Study on Shield Cutting Prestressed Reinforced Concrete Pipe Piles
[J]. Tunnel Construction, 2025, 45(9): 1782-1790.
|
| [14] |
GAO Guangyi, LI Bokai, ZHAO Shuang, XU Qipeng, ZHU Zhijing.
Advance Grouting Reinforcement Technology for Ultra-High-Pressure Water-Rich Granite Alteration Zones: A Case Study of Gaoligongshan Tunnel Exit on Dali-Ruili Railway
[J]. Tunnel Construction, 2025, 45(8): 1590-1601.
|
| [15] |
YANG Jichen, LIU Wei, YANG Jiawen, HE Shaoyun, LIANG Jiaxin.
Development and Performance Study of a Novel Shield Tail Synchronous Grouting Material Using Granite Manufactured Sand
[J]. Tunnel Construction, 2025, 45(7): 1317-1327.
|