Tunnel Construction ›› 2013, Vol. 33 ›› Issue (5): 343-347.DOI: 10.3973/j.issn.1672-741X.2013.05.002
Previous Articles Next Articles
ZHANG Zhigang, LIU Hongzhou
Received:
Revised:
Online:
Published:
Abstract:
The three major development phases witnessed by immersed highway tunnels are summarized, the key technological issues of immersed highway tunnels, such as the longitudinal profile, structural crosssection, foundation and tube element joints of immersed highway tunnels, are analyzed, and the critical issues and solutions for Hong KongZhuhaiMacao immersed tunnel are presented.
Key words: immersed highway tunnel, Hong KongZhuhaiMacao immersed tunnel, crosssection, foundation, tube element joint
ZHANG Zhigang, LIU Hongzhou. Development and Key Technologies of Immersed Highway Tunnels[J]. Tunnel Construction, 2013, 33(5): 343-347.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/ 10.3973/j.issn.1672-741X.2013.05.002
http://www.suidaojs.com/EN/Y2013/V33/I5/343