Tunnel Construction ›› 2015, Vol. 35 ›› Issue (1): 79-82.DOI: 10.3973/j.issn.1672-741X.2015.01.013
Previous Articles Next Articles
LI Kun
Received:
Revised:
Online:
Published:
Abstract:
There is a superlarge karst cave in the section of ZK250+135~+166 of Yanwan tunnel on EnshiLichuan highway. The tunnel crosses the karst cave along the center and there is large clearance around the tunnel structure. Therefore, the tunnel cannot cross the karst cave by conventional means. The following innovative measures are taken to facilitate the tunnel to cross the karst cave, so as to guarantee the construction safety, operation safety and project schedule: 1) Mucks are backfilled in the karst cave to reach the elevation of the top of the invert and are used as the construction access road and the foundation of the archshaped protection structures; 2) A bridge is built and used as vehiclepassing structure; the super structure of the bridge is of 2×16 m continuous composite girder, the piers of the bridge are of pile foundations and cap beams, and the abutments of the bridge are of enlarged foundation; 3) Archshaped protection structure, which consists of reinforced concrete protection arch, concrete protection arch and sand bag buffers, is located on the mucks backfilled, so as to prevent the protection structure from being damaged by the falling rocks. The engineering practice shows that the measures taken are reliable and rational and can guarantee the safety during the construction and operation of the tunnel.
Key words: long tunnel, Yanwan tunnel, superlarge karst cave, muck backfilling, bridge crossing, arch protection
CLC Number:
U 455.49
LI Kun. Case Study on Coping with Superlarge Karst Cave in Construction of Yanwan Tunnel[J]. Tunnel Construction, 2015, 35(1): 79-82.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/ 10.3973/j.issn.1672-741X.2015.01.013
http://www.suidaojs.com/EN/Y2015/V35/I1/79
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern Xinjiang
Full-Scale Test on Internal and External Pressure Wave Characteristics of High-Speed Trains in Long, Steep Tunnels and Tunnel Group Environments
Evolution of Pore Pressure Around Tunnel Face and Influence of Longitudinal Value of ThreeDimensional Seepage Calculation on It During Construction of a Water Conveyance Tunnel With Rich Water
Synchronous CastinPlace Construction Technology and Equipment Development for TBM Tunnel Invert Arch
Calculation Method and Application of Initial InSitu Stress Interpolation in Longitudinal Section of DeepBuried Long Tunnel
Smoke Exhaust Structure Type of Emergency Rescue Station of Extralong Tunnel at HighAltitude Plateau Areas
Key Technology and Application of Efficient Tunneling of an Extra-Long Tunnel Bored by Two Tunnel Boring Machines
Physiological Load and Driving Safety for Drivers at Entrance and Exit of an ExtraLong Tunnel