ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2016, Vol. 36 ›› Issue (5): 569-576.DOI: 10.3973/j.issn.1672-741X.2016.05.012

Previous Articles     Next Articles

Key Technologies for Slurry Shield Crossing  Shallowburied Water Permeable Strata

WANG Mingsheng   

  1. (China Railway Tunnel Group Co., Ltd., Luoyang 471000, Henan, China)
  • Received:2015-10-08 Revised:2016-01-19 Online:2016-05-20 Published:2016-05-25

Abstract:

The research of key technologies for largediameter slurry shield under shallowburied strata in flourishing city in China is weak. Study and analysis are made on large diameter shield launching in shallowburied strata, deformation prediction of railway bridge and optimization design and adaptability improvement of slurry separation system by taking underground tunnel on North Huancheng Road in Hangzhou for example. The study results show that: 1) The consolidation length of end soil should be larger than shield body length about 1 ring length. 2) The measured deformation results coincide with the theoretical prediction results, so as to verify the importance of theoretical predictions. 3) The slurry separating effect has been significantly improved by increasing rods and modifying the lower vibration screen, etc.

Key words: largediameter slurry shield, flourishing city, shallowburied strata, shield launching, deformation prediction, slurry separation

CLC Number: