Tunnel Construction ›› 2016, Vol. 36 ›› Issue (5): 619-626.DOI: 10.3973/j.issn.1672-741X.2016.05.019
Previous Articles
LI Hai, ZHU Changsong*
Received:
Revised:
Online:
Published:
Abstract:
The shield should be transported to launching shaft in tunnel after dismantling when the receiving shaft has been closed. As a result, a series of shield dismantling methods for 6 390 mm EPB shield used in Line No. 6 of Tianjin Metro, including cutterhead dismantling, front shield dismantling, shield body dismantling and shield tail dismantling, are designed and applied; and the shield transport in tunnel can be achieved. The abovementioned shield dismantling methods can provide reference and guidance for similar projects in the future.
Key words: earth pressure balance (EPB) shield, shield dismantling method, closed station, shield receiving
CLC Number:
U 455
LI Hai, ZHU Changsong. Analysis of Shield Dismantling Method under Conditions of Closed Receiving Shaft[J]. Tunnel Construction, 2016, 36(5): 619-626.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2016.05.019
http://www.suidaojs.com/EN/Y2016/V36/I5/619
Freezing Reinforcement and Rehabilitation of Tunnel Damage due to Gushing Water and Sand During Shield Receiving
Receiving Technology of Multiple Shields in Oblique Cross Passage under Complex Conditions
Study on Dismantle Technology of 6 680 mm Shield in Narrow Mined Tunnel
Research on Soil Conditioning of WaterRich Sandy Gravel Strata Based on Shield Tunneling Effect