| [1] |
DENG Mingjiang, TAN Zhongsheng.
Methods for Evaluating Geological Adaptability of Open-Type TBM
[J]. Tunnel Construction, 2025, 45(6): 1043-1060.
|
| [2] |
QIAN Qihu, HU Xiaoqiang, LI Shuchen, CHEN Jian, ZHU Weibin.
Recent Advances in Key Technologies of Shield Tunnel Engineering in China
[J]. Tunnel Construction, 2024, 44(5): 897-926.
|
| [3] |
DU Lijie, ZHANG Zheng, LI Qingwei, ZHANG Weidong, DU Chuanqi, LIU Jiayi, YANG Yalei.
Comparative Analysis on Adaptability and Applications
of DoubleShield Open Tunnel Boring Machines
[J]. Tunnel Construction, 2023, 43(6): 921-928.
|
| [4] |
ZHANG Jianming, SHI Kebin, DALAYIHAN Bahetebieke, SHAN Hongze, SHI Renyi, FU Tao, LU Zhipeng.
Evaluation and Prediction of TBM′s
Geological Adaptability Based on VariableWeight Set PairMultidimensional Linked
Normal Cloud Model
[J]. Tunnel Construction, 2023, 43(4): 645-657.
|
| [5] |
WANG Congjun.
Experimental Study and Application of Setting Time of Shotcrete
[J]. Tunnel Construction, 2022, 42(S2): 44-50.
|
| [6] |
WANG Xiang, ZHAO Yirui, SONG Zhanping, ZHAO Keming, SU Wanying.
A Method of Surrounding Rock Classification for
Construction of Cantilever Roadheader Based on Tunneling
Performance
[J]. Tunnel Construction, 2022, 42(S1): 197-204.
|
| [7] |
ZHAO Xue, GU Weihong.
Adaptability Evaluation of Tunnel Bored by TunnelBoring
Machine Based on
Grey Relational AnalysisSparrow Search AlgorithmElman Neural Network
[J]. Tunnel Construction, 2022, 42(11): 1879-1888.
|
| [8] |
GUO Zhi, TANG Xigang, HAN Lisen, TIAN Bin, DING Shaojun, LU Xiaofeng.
Study and Practice on Negative Ring Launching
Technique for
DoubleShield TBM Used in Qingdao Metro
[J]. Tunnel Construction, 2021, 41(S1): 425-.
|
| [9] |
WANG Yanjie, LI Cangsong, SHI Yongyue, ZHANG Tao, WANG Bin.
Adaptability Analysis of TBM in Main Unfavorable
Geological of Sichuan-Tibet Railway Tunnel and Its Key
Construction Technologies
[J]. Tunnel Construction, 2021, 41(S1): 470-.
|
| [10] |
DU Chuangdong, ZHOU Lujun, DUO Shengjun, HE Fei.
川藏铁路隧道TBM适应性选型分析及不良地质对策与思考
[J]. Tunnel Construction, 2021, 41(6): 897-912.
|
| [11] |
LYU Yonglin, ZHANG Dongjie, TANG Wenxi, YANG Xuezhong, QIN Xiaofeng, REN Yi.
Adaptability Analysis of SingleCantilever
Tunneling Machine in ShallowCovered
Tunnel Excavation in Busy Urban Areas: a Case Study on
New Hongyan Tunnel Crossing underneath Underground
Shopping Mall
[J]. Tunnel Construction, 2021, 41(4): 649-656.
|
| [12] |
WANG Weijun, YANG Weihua, LIU Meng, LIU Wei.
Adaptability of Remanufactured Shield Boring
underneath Piles of a Viaduct
[J]. Tunnel Construction, 2021, 41(4): 666-673.
|
| [13] |
ZHU Tingyu, WANG Huanlong, SONG Zhilai, LUO Maolin, ZHANG Lei.
Application of BoomType Roadheader in RedBed Tunnel in West Yunnan
[J]. Tunnel Construction, 2021, 41(3): 458-466.
|
| [14] |
WANG Baiquan, ZUO Long, LIU Yongsheng, MENG Jianxian.
Adaptive Design of Earth Pressure/Slurry Balance Dualmode
Shield Machine
[J]. Tunnel Construction, 2020, 40(S2): 314-318.
|
| [15] |
CHEN Jun, YUAN Jiang, WANG Fangling.
Adaptability of Short-term and Long-term Turnback Capacity of
Preliminary Terminal with Double Crossover: a Case Study
on Tanze Station of Phase 2 Project of Nanning Metro Line No. 2
[J]. Tunnel Construction, 2020, 40(3): 389-396.
|