[1] |
CHEN Jun, YUAN Jiang, WANG Fangling.
Adaptability of Short-term and Long-term Turnback Capacity of
Preliminary Terminal with Double Crossover: a Case Study
on Tanze Station of Phase 2 Project of Nanning Metro Line No. 2
[J]. Tunnel Construction, 2020, 40(3): 389-396.
|
[2] |
SI Yudi.
Construction Technology of Doubleshield TBM Passing through Station in Urban Rail Transit Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 411-419.
|
[3] |
ZHANG Xudong.
Preliminary Study on Selection of Mechanized Equipment for Drilling and Blasting Construction of SichuanTibet Railway Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 420-432.
|
[4] |
SONG Tiantian, LI Hongbo, CHEN Gang.
Problems and Countermeasures for Doubleshield TBM Applied in Shenzhen Metro
[J]. Tunnel Construction, 2019, 39(6): 998-1004.
|
[5] |
YANG Yandong, CHEN Kui, ZHANG Xiao.
Development and Application of Key Technologies for TBM Used in Complex Geological Conditions
[J]. Tunnel Construction, 2019, 39(6): 1052-1058.
|
[6] |
HE Boning.
Guiding System Based on Doubleshield TBM
[J]. Tunnel Construction, 2019, 39(5): 761-765.
|
[7] |
WANG Xiaoqiang, GUO Zhi, WANG Yidong, LI Changda, HAN Lisen, XU Chaoqun.
Application of Separate Launching Technology of Doubleshield TBM to Qingdao Metro Line No. 1
[J]. Tunnel Construction, 2018, 38(9): 1573-1578.
|
[8] |
GUO Zhi, WANG Xiaoqiang, LIU Lihuan, XU Chaoqun, LI Changda, QU Qiufen.
Application of Mobile Shuttle Conveyor to Mucking of Doubleshield TBM Tunneling
[J]. Tunnel Construction, 2018, 38(7): 1251-1256.
|
[9] |
QI Mengxue, ZHOU Yanling.
Study and Application of Sustained, Proportional and Speedy (SPS) Construction Method for TBM Tunnel
[J]. Tunnel Construction, 2018, 38(11): 1860-1867.
|
[10] |
CHEN Jian.
Study of Cutterhead and Cutting Tool Selection and Cutting Tool Replacement of Largediameter Shield under Atmospheric Condition
[J]. Tunnel Construction, 2018, 38(1): 110-117.
|
[11] |
GUO Zhi, WANG Xiaoqiang, WANG Yidong, LIU Lihuan, QU Qiufen.
Adaptive Design and Application of Doubleshield TBM to Qingdao Metro Tunnel
[J]. Tunnel Construction, 2018, 38(1): 135-141.
|
[12] |
LI Longfei, NING Xiangke, LIU Xiaoheng, ZHANG Ningchuan, XIAO Bo, ZHANG Qian.
Design, Study and Discussion of Hydraulic Supporting Equipment on Bottom of Front Shield of Doubleshield TBMs
[J]. Tunnel Construction, 2017, 37(S1): 194-198.
|
[13] |
YANG Jihua, QI Sanhong, GUO Weixin, ZHANG Dangli.
Study of Surrounding Rock Classification of Diversion Tunnel of CCS Hydropower Station in Ecuador Bored by Doubleshield TBM
[J]. Tunnel Construction, 2017, 37(7): 788-793.
|
[14] |
QI Mengxue.
Study of Engineering Adaptability of Multifunctional Service Vehicle (MSV) to TBM Construction Transportation
[J]. Tunnel Construction, 2017, 37(11): 1475-1482.
|
[15] |
JIANG Shuping, XIE Feng, WANG Xingxing, QIN Feng, QIN Zhifu.
Study of Geological Sensitivity and Structural Adaptability of Interchange Tunnel
[J]. Tunnel Construction, 2016, 36(8): 897-905.
|