Quality Control for Integral Formwork Construction Appearance of Gutter Cable Groove

XU Lei   

  1. (China Railway 12th Bureau Group Co., Ltd., Taiyuan 030032, Shanxi, China)
  • Received:2017-07-15 Revised:2017-12-08 Online:2017-12-30 Published:2018-02-25

Abstract:

Appearance quality of cutter cable groove, i.e. linearity and surface bubble, is difficult to control due to complex structural design and small crosssection size. Stress analysis of framework, components adding and elevation precontrol are used to reduce the floating height of the framework; adnexed vibrator adding on the framework and its layout optimization and acting time monitoring of the vibrator are used to reduce the bubble on concrete surface.

Key words: gutter, cable groove, integral formwork, displacement and deformation, elevation precontrol