[1] |
HUANG Zhangjun, YANG Yanling, TANG Dongsang, ZHANG Weizhong.
Numerical Simulation and Monitoring of Reaction Wall
of Launching Shaft for Large Rectangular Pipe Jacking
[J]. Tunnel Construction, 2020, 40(7): 972-980.
|
[2] |
LYU Qingzhou, TANG Ximing.
Improvement and Application of Pipe Jacking Machine in
Complex Stratum with Steel Bar and Other Flexible Sundries
[J]. Tunnel Construction, 2020, 40(7): 1066-1071.
|
[3] |
LI Jie, ZHANG Xin, MA Chao, YANG Long, GUO Jingbo.
Analysis and Experimental Research on Synchronous
Performance of Segment Erector Lifting System
[J]. Tunnel Construction, 2020, 40(7): 1072-1080.
|
[4] |
JIANG Lijie, WEN Yongliang, JIA Lianhui, CHEN Baozong, HE Fei.
Design and Analysis of a New TBM Propulsion System
with Small Turning Radius
[J]. Tunnel Construction, 2020, 40(7): 1081-1087.
|
[5] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[6] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[7] |
HAN Huaxuan.
Study on Selection of Tunnel Design Standard for JakartaBandung Highspeed Railway Project in
Indonesia
[J]. Tunnel Construction, 2020, 40(6): 845-858.
|
[8] |
HUANG Wei.
Optimization Design of Segmental Structure of Large
Crosssection Rectangular Pipe jacking Tunnel
[J]. Tunnel Construction, 2020, 40(6): 859-867.
|
[9] |
LI Yabo, LI Jing.
Design of Lshaped Joint Concrete Lining
Formwork Trolley
[J]. Tunnel Construction, 2020, 40(6): 898-904.
|
[10] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[11] |
LUO Duhao, JIANG Si, LIU Jianyou.
Improvement Technology of Bearing Capacity of
Prestressed Anchor Cable in
Large span Tunnel: a Case Study on Badaling Great Wall Station
[J]. Tunnel Construction, 2020, 40(6): 873-879.
|
[12] |
SUN Haibo.
Key Technology of Main Drive Assembly and Inspection
Technology of Meshing Quality of Gear Pair during TBM Remanufacturing
[J]. Tunnel Construction, 2020, 40(6): 890-897.
|
[13] |
ZHANG Zhenhua, BAI Yonghou, GUO Chun, CHENG Jianghao.
Noise Propagation Characteristics of Tunnel
Construction by
Drilling and Blasting Method
[J]. Tunnel Construction, 2020, 40(6): 821-826.
|
[14] |
CHEN Xianzhi, CHENG Yong, YANG Xiaolong, LIU Fei, HU Qinxin, LIU Pengfei.
Experimental Study on Ground Conditioning Technology for EPB Shield Boring in Water-rich Gravel Stratum
[J]. Tunnel Construction, 2020, 40(5): 636-643.
|
[15] |
宋超业, 贺维国, 吴钇君.
高水压过海盾构隧道建设关键技术可行性初探
[J]. Tunnel Construction, 2020, 40(5): 717-726.
|