[1] |
HUANG Zhangjun, YANG Yanling, TANG Dongsang, ZHANG Weizhong.
Numerical Simulation and Monitoring of Reaction Wall
of Launching Shaft for Large Rectangular Pipe Jacking
[J]. Tunnel Construction, 2020, 40(7): 972-980.
|
[2] |
LYU Qingzhou, TANG Ximing.
Improvement and Application of Pipe Jacking Machine in
Complex Stratum with Steel Bar and Other Flexible Sundries
[J]. Tunnel Construction, 2020, 40(7): 1066-1071.
|
[3] |
HUANG Wei.
Optimization Design of Segmental Structure of Large
Crosssection Rectangular Pipe jacking Tunnel
[J]. Tunnel Construction, 2020, 40(6): 859-867.
|
[4] |
朱雁飞, 郭 彦, 潘伟强, 赵笑鹏.
自由断面管幕法在饱和软土地区桂桥路站地铁工程的应用
[J]. Tunnel Construction, 2020, 40(4): 552-561.
|
[5] |
WU Yanxing, XIAO Wei, ZHOU Qian, SUN Lei, XU Guangyi.
Design and Research of Open Type Rectangular Pipe Jacking Machine
[J]. Tunnel Construction, 2020, 40(4): 591-596.
|
[6] |
HAN Xianmin, XIAO Mingqing, LI Wenjiang, ZHU Yongquan.
Influence of Multipipe Jacking of Pipe CurtainStructure Method on Settlement of Platform and Track of Railway Station
[J]. Tunnel Construction, 2020, 40(2): 170-178.
|
[7] |
LI Zhijun, FANG Youliang, XIAO Gang, LAI Wenhui, QU Yong, FU Jinyang, XU Zan.
Ground Deformation Characteristics of Water-rich Gravel Stratum during EPB Shield Stop
[J]. Tunnel Construction, 2020, 40(1): 106-113.
|
[8] |
DING Jianmin, DONG Zibo, MO Zhenze, JIN Yongfu, DING Jian, WANG Nailong.
Field Experimental Study on T-connected Tunnel with Pipe Jacking Method
[J]. Tunnel Construction, 2020, 40(1): 28-34.
|
[9] |
YANG Yifeng, LIAO Shaoming, WU Dongpeng.
Prediction and Analysis of Long-term Settlement of Large Cross-section Quasi-rectangular Combined Pipe Jacking Excavated Station in Soft Soil
[J]. Tunnel Construction, 2019, 39(S2): 213-219.
|
[10] |
GAO Jun, MENG Xiaowei, MA Longxiang, ZHANG Chao, LIU Jinchao.
Protection Schemes for Pipe Jacking Construction of Underpass Adjacent to Bridge in Soft Soils
[J]. Tunnel Construction, 2019, 39(S2): 234-241.
|
[11] |
XIONG Haoxiang, XU Qingshuang, REN Hui.
Investigation on Jacking Force Parameters of Curved Piperoofing Construction in Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 146-151.
|
[12] |
DAI Cong, HE Chuan, LIU Chuankun, GUO Wenqi.
Influence of Pipe Roof Layout Range on Stability of Surrounding Rock of Soft Rock Tunnel
[J]. Tunnel Construction, 2019, 39(9): 1437-1444.
|
[13] |
DAI Zhiren, REN Jian, LI Xiaoqiang, WANG Tianming.
Technologies for Shield Tunnel Crossing Underneath Turnout Groups of Railway Turnout Area in Waterrich Sandy Cobble Stratum
[J]. Tunnel Construction, 2019, 39(6): 1005-1013.
|
[14] |
HE Shanning, DOU Xiaotian, ZHAO Liyong, CUI Xianhui, WANG Jinbo, BAO Qingfeng.
Analysis of Thrust Force of Adjacent Construction of Shallowburied Rectangular Pipe Jacking Tunnel Group
[J]. Tunnel Construction, 2019, 39(3): 383-390.
|
[15] |
GAO Yi, FENG Chaoyuan, CHENG Peng.
Application of Structural Cut and Convert Method to Underground Space Development
[J]. Tunnel Construction, 2019, 39(3): 398-406.
|