| [1] |
LIU Qingzheng YANG Yandong, LU Gaoming, YAN Renfu, ZHANG Yongming, ZHU Xiaoliang, LI Enlei, LIU Wenshuai, WANG Junli, LIU Qiang, YAO Xiaomin, ZHAI Chaojie.
Optimization of Advance Pipe Roof Support Parameters for TBM Tunnels Based on Response Surface Methodology and Genetic Algorithms
[J]. Tunnel Construction, 2026, 46(S1): 443-455.
|
| [2] |
LI Peinan, XIE Jiangshan, LIU Xue, LIU Jun, YIN Mei, RUI Yi.
Physics-Data-Driven Soil-Machine Interaction Mapping Model and Intelligent Optimization Algorithms for Subaqueous Curved Pipe Jacking
[J]. Tunnel Construction, 2026, 46(6): 1171-1185.
|
| [3] |
HAN Jialin, LIU Xue, WANG Xianjun, XIE Zheng.
Global Typical Case Statistics and Development Analysis of Full-Face Tunnel Boring Machines
[J]. Tunnel Construction, 2026, 46(6): 1359-1382.
|
| [4] |
YANG Shichong, ZHANG Peng, LI Kaiqi, GUO Jingran.
Calculation Model for Jacking Force of Straight Steel Pipe Jacking Considering Lateral Deformation Effect
[J]. Tunnel Construction, 2026, 46(5): 1016-1027.
|
| [5] |
YI Xiaojun, SONG Zifan, LI Yang, LI Jiacheng, ZHANG Zhongjie, ZHANG Chunhui, LIU Jingsheng, FENG Lihua, LYU Xiangfeng.
Experimental Investigation of Jet Oscillation for Reducing Jacking Resistance Caused by Muck Accumulation in Hard Rock Pipe Jacking
[J]. Tunnel Construction, 2025, 45(8): 1483-1493.
|
| [6] |
MEI Jiahao, ZHANG Peng, LI Shuiming, ZHANG Yunlong, XU Yong, WU Rudong.
Jacking Force Calculation of Rectangular Pipe Jacking
Project Under Different Slurry Lubrication Conditions
[J]. Tunnel Construction, 2025, 45(4): 774-781.
|
| [7] |
CUI Lingyue.
Mechanical Response
Characteristics and Engineering Applications of Advance Long-Pipe Roofs for Tunnels
[J]. Tunnel Construction, 2025, 45(1): 120-131.
|
| [8] |
WANG Zhiqiang, WANG Jinli, FAN Dongdong, LIU Tianshuang, TAN Yong.
Parameters Analysis of Long-Distance Rectangular Pipe Jacking Underneath Beijing-Hangzhou
Grand Canal
[J]. Tunnel Construction, 2024, 44(S2): 159-167.
|
| [9] |
HUANG Shuhua, ZHENG Zhenji, SHENG Jian, XIE Dianyan, ZHANG Liang, CHEN Xiangsheng, SU Dong.
Comparative Study on Construction Schemes for Connecting Channel of Underwater Super-Large Diameter Shield Tunnel: A Case Study on Haizhuwan Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2024, 44(S1): 408-417.
|
| [10] |
GONG Lun, GUO Xiaohang, WANG Lichuan, YANG Jikang, SUN Dishuang.
Experimental Study on Bearing Characteristics and Support Parameters of Tunnel Pipe-Roof Supports
[J]. Tunnel Construction, 2024, 44(8): 1554-1566.
|
| [11] |
ZHANG Mingju, KANG Bo, LI Pengfei, PANG Yuekui, WANG Xijun, WU Hao.
Influence of Cross-Passage Construction Using Front-Traction
Pipe Jacking Method on Mechanical Properties of Metro
Shield Tunnel
[J]. Tunnel Construction, 2024, 44(6): 1165-1173.
|
| [12] |
SONG Yuxiang, ZHENG Yongxiang, ZHANG Yanqing, XU Boning, LIU Yong.
Effects of Transverse Reinforcement on Mechanical Performance of Eccentric Compression Members in Pipe Roof Prefabricated Structures
[J]. Tunnel Construction, 2024, 44(6): 1174-1183.
|
| [13] |
YUAN Rui, ZHAO Xiaopeng, LI Pengfei, LI Zhen, MIN Fanlu.
TimeVarying Consolidation of Grout
Prepared by Waste Rock Slag for Grouting Behind Lining and Its Influence on Ground Settlement:
A Case Study of Heyan
Road Yangtze RiverCrossing Shield Tunnel in Nanjing,
China
[J]. Tunnel Construction, 2024, 44(4): 762-770.
|
| [14] |
REN Hui, HONG Zequn, , ZHANG Jun.
Experimental Study on Outer Insulation Influence of
Profiled Enhancing
Freezing Pipes on Effect of FreezeSealing Pipe Roofs
[J]. Tunnel Construction, 2024, 44(1): 100-108.
|
| [15] |
WANG Jinyi, QIU Yan.
Targeted Design and Construction Technology of QuasiRectangular
Pipe Jacking Machine for Standard CrossSection Pedestrian Passage in Metro Station: A Case Study of Jing′an Temple Station of
Shanghai Rail Transit Line 14
[J]. Tunnel Construction, 2023, 43(S2): 565-577.
|