Targeted Design and Construction Technology of QuasiRectangular
Pipe Jacking Machine for Standard CrossSection Pedestrian Passage in Metro Station: A Case Study of Jing′an Temple Station of
Shanghai Rail Transit Line 14
WANG Jinyi, QIU Yan. Targeted Design and Construction Technology of QuasiRectangular
Pipe Jacking Machine for Standard CrossSection Pedestrian Passage in Metro Station: A Case Study of Jing′an Temple Station of
Shanghai Rail Transit Line 14[J]. Tunnel Construction, 2023, 43(S2): 565-577.
CHEN Kunyang, CHEN Xiangsheng, WANG Lei, YANG Wensheng, WU Huanyu, DUAN Huanbo.
Greenhouse Gas Emissions of Open
[J]. Tunnel Construction, 2023, 43(S1): 189-197.