ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2019, Vol. 39 ›› Issue (12): 2011-.DOI: 10.3973/j.issn.2096-4498.2019.12.011

Previous Articles     Next Articles

Evaluation of Floating Risk of Shield Tunnel Segments Based on Cloud Model and D-S Evidence Theory

TANG Yangyi1, WU Xianguo1, CHEN Hongyu2, TAO Yanyan3,∗, WANG Hu4, ZENG Tiemei5, ZHANG Limao2   

  1. (1. School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China; 2. School of Civil Engineering and Environment, Nanyang Technological University, Singapore City 639798, Singapore; 3. Wuchang Shouyi University, Wuhan 430064, Hubei, China; 4. China Railway Tunnel Group, Guangzhou 510000, Guangdong, China; 5. Wuhan Metro Group Co., Ltd., Wuhan 430030, Hubei, China)
  • Received:2019-07-17 Online:2019-12-20 Published:2019-12-20

Abstract:

In order to quantitatively evaluate and analyze the floating risk of the shield tunnel and carry out targeted risk control, the floating risk evaluation index system and evaluation standard of the segments of the shield tunnel on Huangpu Road Station-Xujiawang Station of Wuhan Metro Line No. 8 are constructed, and a floating risk evaluation model of the shield tunnel segments is established based on the cloud model and Dempster-Shafer(D-S) evidence theory. And then the subjection degree of the floating risk level of the monitoring section is calculated according to the engineering construction measurement data, the evidence is formed after naturalization, and D-S evidence fusion is carried out; the historical evidence is updated with the evidence at the present moment based on conditionization linear combination regulation, and the security risk level of the floating risk in the monitoring range is more secure at the present time. Finally, the corresponding treatment measures are given for the material factors with low security level. The results can provide a new idea and method for the evaluation and management of the floating risk of tunnel segments during construction.

Key words: shield tunnel, segment floating risk evaluation, cloud model, Dempster-Shafer (D-S) evidence theory, evidence fusion and updating

CLC Number: