Abstract: In order to solve the problems of single factor and shortterm prediction in the existing calculation methods of shield tunnel settlement, a simplified calculation method of tunnel settlement under the combined action of consolidation and rheology of soft soil is proposed, which is verified by a practical engineering case. Firstly, the consolidationrheological coupling model is established based on the Merchant rheological model and TerzaghiRendulic theory of twodimensional consolidation. The longterm settlement of shield tunnel is divided into two parts by the model, i.e. the main consolidation settlement caused by excess pore water pressure dissipation and the secondary consolidation settlement caused by soil rheology. And then, the longterm settlement analytical formula of the tunnel is solved by considering the influences of surface load, soil characteristics, structure selfweight and train load. Lastly, three typical sections of the new shield tunnel are selected to predict the longterm settlement of the tunnel, and the dissipation time of excess pore water pressure, settlement rate and final settlement are compared and analyzed. The results show that: (1) In the initial stage of operation, the dissipation speed of the excess pore water pressure of the soil around the tunnel is faster, especially in the first 2 years. With the passage of time, the dissipation speed of each section tends to be stable gradually. (2) The longterm settlement of the shield tunnel is related to the character of the underlying soil; the greater the thickness, the worse the character of the underlying soil layer, and the larger the settlement. The final settlement prediction values of sections 1, 2 and 3 are 146.8 mm, 97.6 mm and 46.1 mm, respectively.
Key words: deep soft ground, excess pore water pressure, consolidationrheological coupling model, shield tunnel, longterm settlement
CLC Number:
U 452
LIU Jianmei. Longterm Settlement Calculation of Shield Tunnel in Section of Deep Soft Ground in Nansha District, Guangzhou[J]. Tunnel Construction, 2020, 40(S1): 138-144.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.S1.017
http://www.suidaojs.com/EN/Y2020/V40/IS1/138
Key Technologies for Controlling Large Deformation of Soft Rock Tunnels with High Geostress
Law of Ground Settlement Caused by Middle Rock Pillar in Highway Tunnel with Small Clear Distance
Construction Methods and Asymmetric Design Optimization for ShallowBuried Tunnels Subjected to Unsymmetrical Loads
A Design Scheme for Lateral Launching of a Double Track Shield Tunnel Using a Mined Single Channel with a Composite Structure
Research on Mechanical Characteristics of LargeSpan Tunnels in Bedding Mudstone with Sandstone Strata
Evaluation Indices for Bearing Capacity of Concretefilled Steel Tube Arch in Highway Tunnel and Reasonable Type Selection
#br#
Application of Theoretical Solution of Surrounding Rock Temperature
in Gaoligongshan Railway Tunnel: Surrounding Rock Temperature Distribution Law under Design Air Temperature
Study on Coconstruct Design of Metro Station and Civil Tunnel: a Case Study on Chencun New Town Station on West Extenstion
Section of Shunde on Guangzhou Metro Line No.7