[1] |
JIA Lianhui, XIAO Wei, LYU Dan, CHENG Jianlin, HUANG Zhixu, XU Qiong.
Sinking Technology and Industrial Test of FullFace
Shaft Boring Machine with Upper Muck Discharge
[J]. Tunnel Construction, 2022, 42(4): 714-719.
|
[2] |
GONG Haijun, ZHAO Gengpeng, YAN Jian, WANG Bo, ZHANG Yangyang, LI Zeng.
Characteristics and Influencing Factors of Large
Deformation of Ailashan Tunnel of SichuanTibet Highway
[J]. Tunnel Construction, 2021, 41(S2): 129-136.
|
[3] |
GUO Junke, WANG Dujuan.
Research on CutterReplacement Technology for Shield
Machine Using
Robot Based on Visual Navigation Positioning
[J]. Tunnel Construction, 2021, 41(2): 300-307.
|
[4] |
ZHENG Kangtai, JIA Lianhui, NIU Mengjie, LYU Dan, XIAO Wei, WANG Xiaolong.
Development and Key System Test of FullFace
Shaft Tunneling Machine
[J]. Tunnel Construction, 2021, 41(10): 1794-1800.
|
[5] |
YANG Dongjian, ZHUO Puzhou, GUO Zhenggang, MENG Zhichao, BAI Liang, HUO Junzhou.
Design and Experimental Research of TBM Integrated
Cutter System
Based on Robot Operation
[J]. Tunnel Construction, 2020, 40(8): 1236-1242.
|
[6] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[7] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[8] |
HU Jingjun, DOU Xiaotian, LI Zhijun, WANG Jinbo, ZHAO Liyong, LI Yongqiang.
Boring Attitude Control Technology for Shallowcovered and Smallspacing Rectangular Pipe Jacking
[J]. Tunnel Construction, 2019, 39(3): 465-472.
|
[9] |
ZHAI Qianzhi, ZHOU Jianjun, LI Hongbo, WANG Liming.
A Case Study on Double-shield TBM Disc Cutter Wear and Replacement Estimation
[J]. Tunnel Construction, 2019, 39(12): 2081-.
|
[10] |
CHEN Jian.
Research on Disc Cutter and Gear Cutter Replacement Technology forLarge Diameter Slurry Shield under Atmospheric Pressure in Composite Strata
[J]. Tunnel Construction, 2018, 38(S1): 175-181.
|
[11] |
YANG Yu.
Prediction of Disc Cutter Wear of Shield Used in Seacrossing Section on Xiamen Rail Transit Line No. 3
[J]. Tunnel Construction, 2018, 38(S1): 182-187.
|
[12] |
WU Qiong.
Cutter Replacing Technologies for Shield Based on Hardened Mud Membrane
[J]. Tunnel Construction, 2017, 37(S1): 107-110.
|
[13] |
WANG Haoyu.
Research on 4th Generation Cutter Replacing Technology under Atmospheric Pressure for Ultralarge Diameter Airslurry Balance Shield Boring in Complex Strata
[J]. Tunnel Construction, 2017, 37(S1): 143-148.
|
[14] |
LI Longfei, NING Xiangke, LIU Xiaoheng, ZHANG Ningchuan, XIAO Bo, ZHANG Qian.
Design, Study and Discussion of Hydraulic Supporting Equipment on Bottom of Front Shield of Doubleshield TBMs
[J]. Tunnel Construction, 2017, 37(S1): 194-198.
|
[15] |
XU Liming, YANG Yandong, ZHOU Jianjun, CHEN Kui, CAI Guangyuan.
Prediction of Disc Cutter Wear and Replacement of Shield used inSeacrossing Section of Xiamen Rail Transit Line No. 2
[J]. Tunnel Construction, 2016, 36(11): 1379-1384.
|