ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2023, Vol. 43 ›› Issue (1): 151-160.DOI: 10.3973/j.issn.2096-4498.2023.01.016

Previous Articles     Next Articles

Sinking Technology and Application of FullFace Shaft Boring Machines with Upper Muck Discharge

LYU Dan, JIA Lianhui   

  1. (China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016, Henan, China)
  • Online:2023-01-20 Published:2023-02-16

Abstract:

To validate the reliability of the sinking technology of fullface shaft boring machines (SBMs), a case study is conducted on the Ninghai pumped storage and ventilation shaft; design and application of the fullface SBM systems, such as upper muck discharge, excavation, attitude adjustment, and downshaft realtime monitoring are investigated. The results reveal the following: (1) The arrangement of circumferential drain grooves on the shaft wall and parameter optimization of boring and mucking guarantee successful boring by SBMs in a watercontaining tuff stratum. (2) The front cutters fulfill the operation requirements, and the gripper system and cutter replacement tooling ensure the safe replacement of the front cutters. (3) The specialized attitude adjustment method in SBMs can fulfill the precision requirements. (4) The visualized operation of mucking in a dust environment can be realized based on muck weighting and heatimaging principles. (5) The realtime positioning of operators in a shaft can be realized by using a layered plane positioning system of SBMs based on Ultrawideband.

Key words: fullface shaft boring machine, tuff, upper muck discharge system, cutter replacement, attitude adjustment, realtime monitoring