| [1] |
WU Fan, QI Mengxue, LEI Shengxiang, HUANG Jiangfan, SONG Hongjiao, ZHANG Yuntong, HU Junwei, LI Jucai.
Mucking for TBM Tunneling Using Continuous-Belt Conveyor Technology in Large-Slope Variable-Grade Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(2): 419-429.
|
| [2] |
SUN Yi, YU Hongwei, YE Ming, WU Gensheng, REN Changchun, DU Zhanjun, ZHANG Yunpei, LI Xu, LI Jian.
Intelligent Recognition Methods for Muck Flow Status in Inclined Shaft TBM
[J]. Tunnel Construction, 2025, 45(S2): 214-221.
|
| [3] |
JIA Lianhui, SUN Heng, ZHANG Xingbin, YU Qingzeng, LI Lei, NING Xiangke.
Crucial Construction
Technology of Tunnel Boring Machines for Constructing Large-Slope Inclined Shaft in Pumped Storage
Power Station
[J]. Tunnel Construction, 2024, 44(8): 1660-1668.
|
| [4] |
YANG Lixin.
Issues Related to Application of Jet Fans in
Partitioned Ventilation of
Tunnel Inclined Shafts
[J]. Tunnel Construction, 2023, 43(S1): 54-60.
|
| [5] |
TIAN Jingwei, WAN Xiaoyan, SHI Xianming.
Effect of Air Extraction From Inclined Shafts in
Tunnels on Overturning Stability of HighSpeed
Trains
[J]. Tunnel Construction, 2023, 43(S1): 233-239.
|
| [6] |
WANG Pengxing, HE Fei, NING Xiangke, SENG Xiongfei.
Research and Application of Key Technologies of Large
Diameter Tunnel Boring Machine with Large Slope and UltraSmall
Turning Radius
[J]. Tunnel Construction, 2023, 43(9): 1614-1622.
|
| [7] |
XU Jianfeng, XU Zhonglin, GUO Chun, YUAN Kun, DONG Haijiang, YANG Xiaobing, YANG Yongpeng, TIAN Ye, CHEN Yuqi.
Characteristics of Carbon Emissions from Excavation
and Supporting During Construction of
Inclined Shafts of Highway Tunnels
[J]. Tunnel Construction, 2023, 43(7): 1146-1152.
|
| [8] |
TANG Jianguo, PENG Zhengyang, ZHANG Xiangfu, REN Xin, YUE Jinwen, ZHOU Fangjian.
Effect of Tunneling Parameters on Mucking Performance
of Tunnel Boring Machine Cutterhead in PumpedStorage Power Station Inclined Shaft
[J]. Tunnel Construction, 2022, 42(S2): 29-35.
|
| [9] |
PEI Zhenzhen, WANG Yanan.
Economic Comparison of Dimension of Inclined Shaft
CrossSection and Ventilation Pipe of DoubleTube Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 213-219.
|
| [10] |
LIAO Xiaochun.
Cost Determinate Method of Tunnel Boring Machine-Type Selection for Hard Rock Tunnels
[J]. Tunnel Construction, 2022, 42(S2): 508-515.
|
| [11] |
WEN Bin.
Key Technology and Application of Efficient Tunneling
of an Extra-Long Tunnel
Bored by Two Tunnel Boring Machines
[J]. Tunnel Construction, 2022, 42(S1): 433-441.
|
| [12] |
YANG Yang, TANG Ke, GONG Bin, YAN Jian, WANG Bo.
Drainage Technology of Main Tunnel Construction
Assisted by Inclined Shaft in High-Altitude Water-Rich Tunnels: a Case Study on
Extra-Long -Milashan Tunnel of
Nyingchi-Lhasa Highway in Tibet, China
[J]. Tunnel Construction, 2021, 41(12): 2171-2177.
|
| [13] |
WANG Qinghai, YANG Guilin, LI You, FU Jianhai, LIU Yun, MA Guibo.
Analysis and Discussion on Automatic Scheme of Combined Determination of Liquid and Plastic Limits for Limit Moisture Content of Fine-grained Soil
[J]. Tunnel Construction, 2020, 40(5): 644-651.
|
| [14] |
LI Jiangao, LIU Yafei.
Study on Comprehensive Cooling Technology for High
Ground Temperature in Long and Large Inclined Shaft of
DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(10): 1498-1505.
|
| [15] |
QI Mengxue, CHE Xinning, LI Xiuyun.
Application of Composite Highangle Belt Conveyor to Metro Construction
[J]. Tunnel Construction, 2019, 39(9): 1530-1536.
|