ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊2): 117-122.DOI: 10.3973/j.issn.1672-741X.2012.z2.023
Previous Articles Next Articles
ZHOU Qingfu
Received:
Revised:
Online:
Published:
Abstract:
The No. 6 bid section of Harbin railway transit No. 1 line is a tunnel rehabilitation project with 1 500 m length. The surrounding environment of the existing tunnel is complicated. Single side enlarging and local double side enlarging method is adopted. In the paper, the settlement essence is analyzed. The influencing factors and countermeasure of settlement are analyzed in term of humanmachineenvironment system. The settlement control target and process are analyzed. The determination, carrying out and effect estimation of settlement control technologies are analyzed emphatically. The paper can provide references for similar projects in the future.
Key words: existing tunnel, rehabilitation, humanmachineenvironment system, settlement, deformation, controlling technology
ZHOU Qingfu. Study on Construction Risk Control of Settlement of Rehabilitation for Existing Tunnel[J]. Tunnel Construction, 2012, 32(增刊2): 117-122.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.z2.023
http://www.suidaojs.com/EN/Y2012/V32/I增刊2/117