ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊2): 236-241.DOI: 10.3973/j.issn.1672-741X.2012.z2.047

Previous Articles     Next Articles

Application of Energy Saving and Emission Reduction in Phrase I Project of Beijing Metro Line 6

YIN Yapo   

  1. (The 3rd Bid Section of Phrase I Project of Beijing Metro Line 6, The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Beijing 100020, China)
  • Received:2012-07-26 Revised:2012-09-10 Online:2012-12-20 Published:2013-02-19

Abstract:

The energy saving and emission reduction is a systematic project. The social and corporation environments and a suit of stable, reliable and dynamic controlling system are needed. The energy saving and emission reduction is combined with project management. The application of energy saving and emission reduction in phrase I project of Beijing Metro Line 6 is presented in detail. The paper can provide references for energy saving and emission reduction of the similar projects in the future.

Key words: energy saving and emission reduction, Beijing Metro, dynamic control