ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (10): 1071-1076.DOI: 10.3973/j.issn.1672-741X.2015.10.016

Previous Articles     Next Articles

Suggestions on Design and Construction of Pump Stations of  Shieldbored Running Tunnels in Beijing

YANG Zhuangzhi   

  1. (Survey, Design & Research Institute, China Railway Tunnel Group Co. Ltd., Luoyang 471009, Henan, China)
  • Received:2014-12-15 Revised:2015-07-23 Online:2015-10-20 Published:2015-11-09

Abstract:

In the paper, the experience and lessons drawn in the design and construction of the pumping stations of the shieldbored running tunnels in Beijing are summarized and the following suggestions are made: 1) If possible, the cover depth of the pumping stations should be appropriately reduced so as to minimize the difficulty in the construction of the pump stations; 2) In waterrich ground where only deephole grouting is made, there is great water/sand inflow risk in the construction of the pumping stations, therefore artificial freezing or ground surface dewatering should be made as far as possible; 3) Deephole grouting may be used as the final optimized countermeasure. 

Key words: Beijing Metro, shieldbored running tunnel, drainage system, pump station, deephole grouting

CLC Number: