| [1] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [2] |
XIA Runhe, QIAO Xiaoyan, WU Hongqun.
Causes and Prevention of Unsafe Behavior of Metro
Station Construction Workers
[J]. Tunnel Construction, 2021, 41(6): 1024-1031.
|
| [3] |
TIAN Siming, WANG Wei, YANG Changyu, LIU Cheng, WANG Mingnian, WANG Kejin, MA Zhifu, LYU Gang.
Development and Prospect of Railway Tunnels in China
in Recent 40 Years
[J]. Tunnel Construction, 2021, 41(11): 1903-1930.
|
| [4] |
WANG Yesheng, HUANG Jianghua, WU Yong, PENG Shusheng, WU Wei.
Development of Risk Management and Control Platform
for Urban Rail Transit Facility Structure
[J]. Tunnel Construction, 2021, 41(1): 149-155.
|
| [5] |
WANG Shulei, GUAN Panfeng, DING Guosheng.
Risk Management in Early Stage of Connection Gallery
with Freezing Method: a Case Study on Freezing Project of Superlong
Connection
Gallery and Pump Station on Ziyang StationWuliting
Station of
Fuzhou
Rail Transit Line 2
[J]. Tunnel Construction, 2020, 40(S1): 258-265.
|
| [6] |
LU Yaobang, ZHUO Yue, SI Jingzhao, ZHANG Jianshe.
Research on BIM Construction Application in
Gaoligongshan Tunnel on
DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(10): 1516-1524.
|
| [7] |
JIANG Yusheng, SUN Zhengyang, YANG Zhiyong.
Construction Risk Monitoring System and Parameter Warning of EPB Shield
[J]. Tunnel Construction, 2019, 39(7): 1083-1089.
|
| [8] |
ZHANG Zhigang, LI Jinfeng.
Application and Demonstration of HealthSafetyEnvironment Risk Management to Underwater Tunnel of Hong KongZhuihaiMacao Link
[J]. Tunnel Construction, 2019, 39(2): 189-196.
|
| [9] |
TANG Yangyi, WU Xianguo, CHEN Hongyu, TAO Yanyan, WANG Hu, ZENG Tiemei, ZHANG Limao .
Evaluation of Floating Risk of Shield Tunnel Segments Based on Cloud Model and D-S Evidence Theory
[J]. Tunnel Construction, 2019, 39(12): 2011-.
|
| [10] |
DU Chuangdong, ZHANG Jie, TANG Zongxiong.
Key Technologies of Shield Direct Cutting Pile Foundation
[J]. Tunnel Construction, 2019, 39(10): 1666-1677.
|
| [11] |
YU Yu, LI Laosan.
Review on Risk Assessment and Control Measures for Tunnels on Hubei Section of ZhengzhouWanzhou Highspeed Railway
[J]. Tunnel Construction, 2019, 39(1): 157-163.
|
| [12] |
WANG Jianbo, YOU Weibao, LIU Fangmeng, ZHANG Wei, YANG Diying.
Study of Risk Evaluation of Urban Underground Utility Tunnel PPP Project Based on GRASPA
[J]. Tunnel Construction, 2018, 38(9): 1446-1455.
|
| [13] |
WANG Han, HE Weiguo, YUAN Yong.
Lifecycle Risk Evaluation for Qiongzhou Strait Railway Tunnel
[J]. Tunnel Construction, 2018, 38(9): 1513-1519.
|
| [14] |
DAI Jianbiao, GAO Xinglin, ZHANG Minggong.
Risk Assessment and Response to Bidding for Island and Tunnel DesignConstruction Contracting of Hong KongZhuhaiMacao Bridge Project
[J]. Tunnel Construction, 2018, 38(7): 1138-1148.
|
| [15] |
YU Baomin, JI Yuguo.
Stateofart and Risk Management of Shield Chamber Opening Technology
[J]. Tunnel Construction, 2018, 38(4): 683-693.
|