[1] |
ZHANG Xing, SU Minghao, GAN Yu, FENG Haixiang.
Scheme Design of Rectangular Shield for Underground
Utility Tunnel
[J]. Tunnel Construction, 2023, 43(S1): 365-372.
|
[2] |
LI Bingtian, MEI Yongbing, LI Shu, REN Yi.
Application Mode of Electric New Energy Mucking
Equipment in Plateau Transportation Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 544-549.
|
[3] |
TAN Zhongsheng, WU Jingang.
Review and Prospects of Drilling and Blasting Tunnel
Construction Technology in China
[J]. Tunnel Construction, 2023, 43(6): 899-920.
|
[4] |
LIU Shaopeng, DENG Bin, CAO Yingfeng, XIA Fengyong.
Geographic Information System + Building Information
Modeling-Based Forward
Design Method: Applications in Bridges and Tunnels
[J]. Tunnel Construction, 2023, 43(4): 674-689.
|
[5] |
YE Fei, XIA Tianhan, ZHANG Xingbing, SU Enjie, LIANG Xiaoming, HAN Xingbo.
Present Situation Analysis and Improvement Suggestions on
Nomenclature of Highway Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 1-5.
|
[6] |
LI Zhijun, LIU Guangzhi, ZHOU Yi, LIU Weizheng, YU Jingbo, CHEN Qiao.
Application of Cantilever Roadheader Method in Loose
Accumulation of a Tunnel on Plateau Railway
[J]. Tunnel Construction, 2022, 42(S2): 363-371.
|
[7] |
XIA Runhe, QIAO Xiaoyan, WU Hongqun.
Causes and Prevention of Unsafe Behavior of Metro
Station Construction Workers
[J]. Tunnel Construction, 2021, 41(6): 1024-1031.
|
[8] |
LIU Jianbing, YANG Changyu, WANG Huanlong, ZENG Yunchuan.
Engineering Application and Main Control Factors of
Selection of Deep and Large Shaft Location for Railway Tunnel
[J]. Tunnel Construction, 2021, 41(3): 411-418.
|
[9] |
LIU Tianzheng, SUN Changjun, WANG Guanghui, LIN Chunpeng, YANG Zhiyong, ZHU Jianxun, YANG Mingyu.
Innovation and Prospect of Safety Risk Classification
Management and Control in Beijing Urban Rail Transit Project Construction
[J]. Tunnel Construction, 2021, 41(11): 1871-1876.
|
[10] |
TIAN Siming, WANG Wei, YANG Changyu, LIU Cheng, WANG Mingnian, WANG Kejin, MA Zhifu, LYU Gang.
Development and Prospect of Railway Tunnels in China
in Recent 40 Years
[J]. Tunnel Construction, 2021, 41(11): 1903-1930.
|
[11] |
LI Zengjun.
GuidedShield Tunneling Method: An
Innovative Thought on Underwater Tunneling Method
[J]. Tunnel Construction, 2021, 41(10): 1801-1808.
|
[12] |
WANG Yesheng, HUANG Jianghua, WU Yong, PENG Shusheng, WU Wei.
Development of Risk Management and Control Platform
for Urban Rail Transit Facility Structure
[J]. Tunnel Construction, 2021, 41(1): 149-155.
|
[13] |
WANG Shulei, GUAN Panfeng, DING Guosheng.
Risk Management in Early Stage of Connection Gallery
with Freezing Method: a Case Study on Freezing Project of Superlong
Connection
Gallery and Pump Station on Ziyang StationWuliting
Station of
Fuzhou
Rail Transit Line 2
[J]. Tunnel Construction, 2020, 40(S1): 258-265.
|
[14] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[15] |
LU Yaobang, ZHUO Yue, SI Jingzhao, ZHANG Jianshe.
Research on BIM Construction Application in
Gaoligongshan Tunnel on
DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(10): 1516-1524.
|