| [1] |
LIU Xiaolin.
Displacement Measurement Method Integrating Improved Oriented FAST and Rotated BRIEF Feature Points With Lucas-Kanade Pyramid Optical Flow and Its Engineering Application
[J]. Tunnel Construction, 2025, 45(8): 1459-1468.
|
| [2] |
ZHOU Shengyang, LIU Shuya, JIANG Shouchao, YAO Haoyu, ZHU Qikai, LIU Xian, LI Wei, WANG Lei.
Scale Model Test on Mechanical Performance of Large-Section Rectangular Pipe-Jacking Metro
Station
[J]. Tunnel Construction, 2025, 45(4): 758-773.
|
| [3] |
HUANG Shuhua, ZHENG Zhenji, SHENG Jian, XIE Dianyan, ZHANG Liang, CHEN Xiangsheng, SU Dong.
Comparative Study on Construction Schemes for Connecting Channel of Underwater Super-Large Diameter Shield Tunnel: A Case Study on Haizhuwan Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2024, 44(S1): 408-417.
|
| [4] |
ZHANG Mingju, KANG Bo, LI Pengfei, PANG Yuekui, WANG Xijun, WU Hao.
Influence of Cross-Passage Construction Using Front-Traction
Pipe Jacking Method on Mechanical Properties of Metro
Shield Tunnel
[J]. Tunnel Construction, 2024, 44(6): 1165-1173.
|
| [5] |
ZHAO Shan, SHAO Yang, TIAN Haowen, GUO Jianglong.
Adaptability of Connecting Gallery Using Pipe Jacking
Method Under Large Deflection Angle
[J]. Tunnel Construction, 2023, 43(S2): 594-599.
|
| [6] |
ZHANG Shuaikun.
Development and Application of a HighPrecision
Assembly System for Integrated Prefabricated Box
Culvert of LargeDiameter Shield Tunnels
[J]. Tunnel Construction, 2023, 43(2): 334-344.
|
| [7] |
FAN Lei, XUE Guangji, LIU Yixiao, FENG Lin.
Review on Trenchless Equipment Technology for Pipeline
Renewal
[J]. Tunnel Construction, 2022, 42(S1): 1-6.
|
| [8] |
YAO Yanming, HUANG Yi, ZHOU Junhong, XIA Hanyong.
Construction Methods for Connecting Passages in Shield
Tunnel of Ningbo Rail Transit Line 4
[J]. Tunnel Construction, 2021, 41(6): 1007-1014.
|
| [9] |
WEI Jiaying, MA Yongzheng, MO Zhenze, LI Liang, JIN Yongfu, DING Jian.
Study on influence of ground settlement in Tjoint
connecting passage with mechanical Pipe Jacking method: With the example
of the
demonstration project of Tjoint
construction of connecting
passage
with pipe jacking method in Wuxi Metro Line 3
[J]. Tunnel Construction, 2020, 40(S2): 136-143.
|
| [10] |
YANG Zhongyong, LIAO Shaoming, LIU Mengbo, ZHAO Guoqiang, XU Weizhong.
Theoretical and Practical Analysis of Vertical Jacking
Attitude of Large Crosssection
PipeRoof Box Culvert in Soft Soil Stratum
[J]. Tunnel Construction, 2020, 40(10): 1448-1454.
|
| [11] |
DING Jianmin, DONG Zibo, MO Zhenze, JIN Yongfu, DING Jian, WANG Nailong.
Field Experimental Study on T-connected Tunnel with Pipe Jacking Method
[J]. Tunnel Construction, 2020, 40(1): 28-34.
|
| [12] |
ZHANG Junru, YAN Congwen, YE Lun, WANG Anhui, ZHAO Zijing, FENG Jimeng.
Analysis of Mechanical Effect of Box Culvert Jacking on Bottom Pipe Curtain
[J]. Tunnel Construction, 2019, 39(S1): 73-79.
|
| [13] |
NIU Jie .
Application of Micro-disturbance Propulsion Construction Technology for Large Cross-section Box Culvert
[J]. Tunnel Construction, 2019, 39(11): 1905-.
|
| [14] |
SU Shuyao, ZHANG Peng, LIU Jiguo, ZENG Cong, MA Baosong.
Optimization Study of Length of Steel Pipe Used in Curved Pipe Roofing of Gongbei Tunnel
[J]. Tunnel Construction, 2017, 37(11): 1442-1448.
|
| [15] |
ZHANG Peng, PAN Jianli, LIU Yingliang, MA Baosong.
Key Construction Technologies for Curved Jacking Pipe Roofing of Gongbei Tunnel
[J]. Tunnel Construction, 2016, 36(8): 968-975.
|