| [1] |
ZHANG Wenming, ZHANG Lifeng, WANG Fei, LU Hailiang, YU Haitao, LI Junqi.
Primary Technology Innovation and Application of Underground Utility Tunnel Construction in Xiong′an New Area, China
[J]. Tunnel Construction, 2026, 46(1): 214-223.
|
| [2] |
ZHU Yanfei, ZHUANG Qianwei, ZHU Yeting, YANG Zheng, HUANG Dezhong, ZHAO Shuai, ZHAI Yixin, QIN Yuan, MA Zhigang.
Experimental Verification of Automatic Assembly Technology for Super-Large Diameter Shield Segments
[J]. Tunnel Construction, 2025, 45(9): 1768-1781.
|
| [3] |
ZHAO Wenxiang, QU Bingyu, WANG Houlin, HUANG Liangliang.
Application of Building Information Modeling Technology in Optimization of Embedded Channels in Shield Tunnel Segments
[J]. Tunnel Construction, 2025, 45(2): 375-381.
|
| [4] |
ZHU Yeting, BI Xiangli, HUANG Dezhong, ZHUANG Qianwei, YANG Zheng, ZHAI Yixin, WANG Zeyuan.
Forward and Inverse Kinematic Solutions and Error Analysis for a Segment Erector With Large Translation Function
[J]. Tunnel Construction, 2024, 44(11): 2149-2158.
|
| [5] |
WANG Qin, WEI Gang, ZHANG Lisha, YANG Zhongxuan.
Reinforcement Effect of USteel
Reinforced Shield Segment Under Excavation Unloading
of Side Foundation Pit
[J]. Tunnel Construction, 2023, 43(2): 285-295.
|
| [6] |
ZHU Yeting, ZHANG Zixin ZHU Yanfei.
Influence of Different Boundary Conditions on
Mechanical Properties
of SpecialShaped Shield Segment Joint
[J]. Tunnel Construction, 2022, 42(6): 1003-1013.
|
| [7] |
XIAO Mingqing, ZHANG Yi, XUE Guangqiao.
Influence of Uneven Annular Joint Surface of Shield Tunnel Segment on Structural Stress
[J]. Tunnel Construction, 2020, 40(2): 153-161.
|
| [8] |
WANG Hongying, XIAN Qingyu, LIU Dagang, ZHANG Qiankun, LIU Yuguo, LIU Zhijie.
Influence of Shield Tunneling Construction Load on Waterproofing Performance of Small Radius Curved Tunnel Segments
[J]. Tunnel Construction, 2019, 39(9): 1453-1460.
|
| [9] |
LIU Xin.
Main Structural Parameter Setting of Universal Segment Based on Tunnel Axis Control
[J]. Tunnel Construction, 2019, 39(8): 1334-1340.
|
| [10] |
QIN Feng.
Application and Development of Rapid Installation Technology for Pipelines in Shield Tunnel
[J]. Tunnel Construction, 2018, 38(S2): 298-302.
|
| [11] |
LIU Xin, LIU Xin, LIU Xiandong.
Study of Layout Technology for Doublesidedwedge Shield Tunnel Segment with Standard Ring and Turning ring
[J]. Tunnel Construction, 2018, 38(5): 805-808.
|
| [12] |
WANG Xiaodong, YU Gang, WU Huiming.
Application of Parameterized Modeling of Shield Segment Based on Revit
[J]. Tunnel Construction, 2018, 38(2): 249-254.
|
| [13] |
HE Shaohui, LI Chenghui, MA Teng, LIU Xiabing, WANG Dahai, LIU Yangpeng.
Study of Influence of Types of Cutterhead of Shield on Sandy Gravel Stratum
[J]. Tunnel Construction, 2017, 37(5): 529-536.
|
| [14] |
ZENG Feng, SONG Tiantian, SU Huayou.
Study of Curing Quality of Shield Segment in Water with Different pH Values
[J]. Tunnel Construction, 2017, 37(2): 174-178.
|
| [15] |
ZHANG Zhenyu, LI Haojie, LI Chaojun, JIA Changheng, FENG Jili.
Experimental Study of Contact Characteristics of Rubber Cushion Used in Shield Segment Joints
[J]. Tunnel Construction, 2017, 37(11): 1404-1408.
|