[1] |
.
Transformation of Anti-Jamming Capability of Chinese Remanufactured Tunnel Boring Machines in Soft Rock Tunnels
[J]. Tunnel Construction, 2025, 45(2): 402-414.
|
[2] |
WANG Zheyong, LIU Chenglong, XU Zhen, XIAO Yongqiang, ZONG Chao, SUN Yingtao, JIANG Yusheng.
Displacement and
Deformation Mode of Complex Rock Strata in Central Urban Area Induced by Double-Shield Tunnel
Boring Machine
[J]. Tunnel Construction, 2024, 44(S2): 135-143.
|
[3] |
JIANG Qiao, WANG Shuangjing, JING Liujie, SHI Yunlong, WEI Xiaolong, LI Pengyu, YANG Chen.
Disc Cutter Wear of Tunnel Boring Machine in Hard Rocks of Pumped Storage Hydropower Station
[J]. Tunnel Construction, 2024, 44(S2): 470-477.
|
[4] |
JIA Lianhui, SUN Heng, ZHANG Xingbin, YU Qingzeng, LI Lei, NING Xiangke.
Crucial Construction
Technology of Tunnel Boring Machines for Constructing Large-Slope Inclined Shaft in Pumped Storage
Power Station
[J]. Tunnel Construction, 2024, 44(8): 1660-1668.
|
[5] |
LI Zonglin, LI Qinglou, ZHANG Lilong, GUO Yang.
Correlation Analysis Between Surrounding Rock
Parameters and Mainframe Vibration of an Open Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(5): 991-999.
|
[6] |
LI Linfeng, TAN Zhongsheng, ZHOU Zhenliang, PENG Wenbo.
Support Effect of Steel Tubes of Open Tunnel Boring
Machine in Tianshan Shengli Tunnel
[J]. Tunnel Construction, 2024, 44(5): 984-990.
|
[7] |
DU Lijie, HAO Hongda, YANG Yalei, LI Qingwei, ZHANG Weidong, LIU Jiayi, FENG Hongchao, JIA Lianhui.
Tunnel Boring Machine Selection and Tunneling Attitude
Control Method for Tunnels With Small Turning Curves
[J]. Tunnel Construction, 2024, 44(5): 1106-1115.
|
[8] |
XUE Jiangsong, YIN Jiankun, CHEN Hongming.
Design and Application of Construction Equipment for
Entire Process of CastinPlace
Inverted Arch in Central Yunan WaterDiversion Project in China
[J]. Tunnel Construction, 2024, 44(3): 605-616.
|
[9] |
YOU Jinhu, XIE Tao, LIU Yongsheng, PAN Yue, YIN Long.
Bearing Analysis of Tunnel Surrounding Rocks for
Tunnel Boring Machine Gripper and Treatments of Unfavorable Geology
[J]. Tunnel Construction, 2023, 43(S1): 473-479.
|
[10] |
WANG Pengxing, HE Fei, NING Xiangke, SENG Xiongfei.
Research and Application of Key Technologies of Large
Diameter Tunnel Boring Machine with Large Slope and UltraSmall
Turning Radius
[J]. Tunnel Construction, 2023, 43(9): 1614-1622.
|
[11] |
DU Lijie, ZHANG Zheng, LI Qingwei, ZHANG Weidong, DU Chuanqi, LIU Jiayi, YANG Yalei.
Comparative Analysis on Adaptability and Applications
of DoubleShield Open Tunnel Boring Machines
[J]. Tunnel Construction, 2023, 43(6): 921-928.
|
[12] |
ZHANG Xueqing, JIA Lianhui, ZHANG Xingbin, LI Chaojie.
Current Developments and Prospects of Mechanized
Tunnel Excavation for Pumped Storage Power Plants in China
[J]. Tunnel Construction, 2023, 43(11): 1811-1820.
|
[13] |
LI Anyun, ZHANG Kai, XU Jinfeng, XIE Xiongyao, KANG Yuanfeng.
Stability of Surrounding Rock and Support Optimization
of a Broken SoftRockInclined
Shaft Bored by Tunnel Boring Machine: A Case Study of
Kekegai SubInclined Shaft
[J]. Tunnel Construction, 2023, 43(11): 1924-1934.
|
[14] |
WANG Shouhui, YANG Xing, JIANG Yusheng, LIU Quanwei, ZHAO Jizeng, ZHU Zhijing, SHAO Changzhi, TAN Zhuolin, YANG Zhiyong.
Synchronous Backfilling Technology for Gravel and
Bottom Grouting Behind Double-Shield Tunnel Boring Machine
Segment: A Case Study of a
Section
of Qingdao Metro Line 6
[J]. Tunnel Construction, 2023, 43(11): 1954-1963.
|
[15] |
GUO Zhi, WANG Xiwei, GONG Yinglei, LI Ping, SUN Fubin, LEI Chenglong.
InTunnel Disassembling Technique of
DoubleShield Tunnel Boring Machine
in Shallow Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 420-426.
|