Tunnel Entering Construction Technology in Slope Wash Soil and Mudslide Accumulation Mix Zone with Shallow Overburden and Asymmetrical Pressure

YU Jingbo1, LI Zhijun1, 2, WANG Qiulin3, REN Ruile4, LIU Guangzhi1, LI Wutao1, LYU Zheng1, SUN Wei1   

  1. (1.China Railway Tunnel Group Co.,Ltd.,Guangzhou 511458,Guangdong,China;2.Southwest Jiaotong University,Chengdu 610000, Sichuan,China;3.Then Second Engineering Co.,Ltd. of China Railway Tunnel Group,Sanhe 065201,Hebei,China;4.Beijing University of Technology,Beijing 100124,China)
  • Online:2022-12-30 Published:2023-03-25

Abstract: The grade Ⅵ surrounding rock at mix zone of slope wash soil and mudslide accumulation with shallow overburden and asymmetrical pressure at tunnel entrance is prone to collapse and landslide, resulting in difficult tunnel entering. As a result, the construction difficulties and rapid tunnel essential entering technologies of a plateau railway are studied. Main studies and conclusions are as follows: (1) The advance large pipe roof is employed to improve the surrounding rock strength at 30 m section of tunnel entrance. (2) 11 end piles and 34 t friction piles are arranged at tunnel entrance and sideslope respectively to solve asymmetrical pressure problem. (3) 1 054 jet grouting piles are arranged within 90 m zone on tunnel top to improve the stability of slope wash soil; a 198 mlong aqueduct is adopted to drain the water on tunnel top right, and the aqueduct is arranged at top of retaining wall innovatively to reduce the mudslide risk in rainy season. (4) The advance smallduct reinforcement and cantilever boring machine are adopted at grade surrounding rock at 30 m mix zone of tunnel entrance to minimize disturbance to surrounding rock; the construction sequence is improve from opencut first and then mining to mining first and then opencut according to construction requirements in winters. The application results show that the methods recommended can minimize the influence of tunnel entering construction on surrounding environment, shorten the construction period, and guarantee the construction safety.

Key words: plateau railway, shallow overburden and asymmetrical pressure, preconsolidation, cantilever boring machine, safe tunnel entering