Synchronous CastinPlace Construction Technology and Equipment Development for TBM Tunnel Invert Arch

XU Pengzu1, 2, YANG Yandong2, 3, *, XU Haifeng1, 2, LIU Wanlin4, WANG Tianyi3   

  1. (1. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450001, Henan, China; 2. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China; 3. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 4. Railway Development Investment Group Co., Ltd., Kunming 650118, Yunnan, China)

  • Online:2023-07-31 Published:2023-08-28

Abstract:

To realize synchronous implementation of tunnel boring machine(TBM) excavation and construction material transportation during invert arch castinplace construction, a design scheme of plane invert arch with bearing platform is proposed through analysis and comparison. Additionally, a synchronous castinplace lining trolley for TBM tunnel invert arch integrating climbing rail, Ushaped main beam, segmented support, stepping shift, and invert arch formwork is developed. Finally, a series of synchronous castinplace techniques for invert arch are developed, which includes track demolition, tunnel bottom muck cleaning, steel bar binding, invert arch casting and maintenance, and track installation. The scheme, trolley, and techniques mentioned have been successfully applied in Xianglushan tunnel of Central Yunnan water diversion project. The castinplace lining of invert arch did not affect the normal construction of TBM. The operation cycle time of 24 m castinplace invert arch in a single warehouse was 44 h, and the construction progress reached 200 m a month, realizing synchronous and efficient operation of invert arch castinplace construction and TBM tunneling, which is worth popularizing.

Key words: invert arch lining, synchronous castinplace, lining trolley, superlong tunnel, Central Yunnan water diversion project