DAI Yong, WANG Meng
Received:
Revised:
Online:
Published:
Abstract:
The running tunnel between Huaxin Street and Guanyinqiao on No. 3 line of Chongqing MRT system is constructed by extrashallow covered mining method. Due to the weak ground at the tunnel crown, the construction of the tunnel is difficult and full of risks. The characteristics of the project are presented and the construction scheme is analyzed in the paper. Key construction technologies, including double side drift method, road header excavation assisted by labor excavation, doublepipe nonshrinkage cementsodium WSS grouting and technology of side wall lining followed by arch lining, are applied in the running tunnel construction. These technologies can provide reference for the construction of similar urban underground works in the future.
Key words: extrashallow cover running tunnel, double side drift method road header construction technology
CLC Number:
U 455.4
DAI Yong, WANG Meng. Construction Technology for ExtraShallow Covered Mined #br# Tunnel on No.3 Line of Chongqing MRT System[J]. Tunnel Construction, 2009, 29(增刊2): 167-170.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I增刊2/167
Soil Conditioning Scheme for Earth Pressure Balance Shield Tunneling in Sandy Cobble Strata Based on Slump Test
Rapid Classification Technology of Surrounding Rock of Tunnel Face Based on ThreeDimensional Reconstruction and Unet Neural Networks
Failure Mechanism of Shield Tunnel Based on Full-Scale Experiment and Analysis of Longitudinal Joint′s Outboard Deformation
Optimization Design of Opening Characteristics and Structure of Cutterhead in Soft Soil under Atmospheric Pressure
Settlement Control Technology in Metro Station Construction with Large Cross-Section Rectangular Pipe Jacking Method: a Case Study of
Jing′an Temple Station of Line No.14 of Shanghai Metro
Impact of Tool Taper and Arc Length on Cutting Efficiency of Pick Cutter on Concrete Diaphragm Wall
Application of Prestressed Anchor Cable Supporting Technology in Roof Ripping Construction of Long-Span Tunnel with High Geostress: a Case study of Muzhailing Tunnel of Weiyuan-Wudu Expressway
Deformation and Grouting Reinforcement for Railway Subgrade Crossed by a DoubleTrack Metro Shield Tunnel in SandyCobble Strata
Research on Antigush Technology for Asymmetrically Pressured Section with Weathered Sac in DrillingandBlasting Subsea Tunnel
under High Water Pressure