[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[4] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[5] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[6] |
ZHANG Xuan, HEI Shiqiang, DAI Shiwei.
Study on Upper Limit of Surrounding Rock Pressure of Shallow Tunnel Based on Variational Principle
[J]. Tunnel Construction, 2020, 40(5): 679-685.
|
[7] |
JIANG Xuepeng, WU Jindong.
Influence of Smoke Backlayering Flow of Vertical Ventilation Shaft in Urban Shallow Tunnels
[J]. Tunnel Construction, 2019, 39(3): 370-377.
|
[8] |
XIAO Guangzhi.
Problems of Railway Tunnel Construction under Some Special Geological Conditions in China and Their Countermeasures
[J]. Tunnel Construction, 2019, 39(11): 1748-.
|
[9] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[10] |
GUAN Xiaojun, LI Chang, QIU Wenge, SHEN Zhijun, GONG Lun, WANG Gang.
Influence of Surrounding Rock Deterioration on Supporting Force of Deep Old Loess Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1806-.
|
[11] |
LI Peng, LI Yang, GAO Yi, YU Shaohui, LI Yingfei.
Analysis and Research on Surface Deformation Law of Pipe Jacking Tunnel Constructed by Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(11): 1838-1847.
|
[12] |
SHI Xianhuo, DAI Yuanquan, GUO Jianqiang.
Calculation and Analysis on Excavation Cycle Length of Shallow Portal Sections of Tunnels Located in Talus Deposits: Case Study on Zhaojiawu Tunnel on MaZhao Highway in Yunnan, China
[J]. Tunnel Construction, 2015, 35(8): 787-791.
|
[13] |
ZHOU Yi, WANG Hailiang, ZHANG Zuyuan, SUN Song.
Study on Microvibration Blasting Technology for Shallow Tunnels Crossing Underneath Existing Buildings in Urban Area
[J]. Tunnel Construction, 2015, 35(1): 89-94.
|
[14] |
ZOU Dechen, WANG Hailiang, WANG Chunhui, LI Chuan.
Study on Blasting Vibration Control of Shallow Tunnel Based on HHT Analysis
[J]. Tunnel Construction, 2014, 34(8): 760-764.
|
[15] |
LI Baoping, GAO Shiming, WANG Rui, QIN Wei.
Application of Analytic Hierarchy Process (AHP) in the Selection of Excavation Methods for Shallow Tunnels
[J]. Tunnel Construction, 2013, 33(9): 726-730.
|