ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Accepts
Accepted, unedited articles published online and citable. The final edited and typeset version of record will appear in the future.
Please wait a minute...
For Selected:
Download Citations
EndNote
Ris
BibTeX
Toggle Thumbnails
Select
Novel Precast Internal Structure in an Electric Power Tunnel and Its#br# Seismic Response Comparison#br#
JIANG Zhiwei, HUANG Yesheng, WU Chenggang, LIN Fang, PENG Zhiyong, FAN Qi, LIU Ying
Tunnel Construction
Accepted: 25 April 2025
Select
Research on Mechanical Characteristics and Application of Steel Cushion Beams for Subgrade Structure Replacement in Railway Tunnels
ZHAO Peng, YE Zhendong, MA Weibin, YAN Mingdong, ZHANG Xiaochen
Tunnel Construction
Accepted: 11 December 2024
Online available: 11 December 2024
Select
Study on Progressive Failure Mechanism and Support Optimization of Tunnel Structure in Daliangshan Expansive Soft Rock Tunnel
LI Shouren, XIE Xiongyao, TANG Genji, LI Peifeng
Tunnel Construction
Accepted: 11 December 2024
Online available: 11 December 2024
Select
Opening Strategy of Long-Distance Immersed Tunnel Ventilation Fans in Urban Areas and the Distribution Pattern of Pollutants#br#
TANG Honghui , WEI Lixin , XU Zhisheng, , ZHAO Jiaming, YU Zihan, WANG Juan, XIE Yiqiang
Tunnel Construction
Accepted: 28 June 2024
Select
Study on Ventilation Flow Field and Gas Transportation Law of Three-lane Gas Tunnel#br#
CHEN Zhiyu, YANG Feng, XIE Ke, LIN Guojin, YANG Wenbo, HE Chuan
Tunnel Construction
Accepted: 30 May 2024
Select
Design and Engineering Practice of C-shaped Connection Channel for Frozen Excavation Method in Rich Water Sand Layer#br#
WANG Qingli
Tunnel Construction
Accepted: 04 February 2024
Select
Application of Multi-refrigerant Combined Freezing Technology in Shield Rescue#br#
DONG Tao, LIAO Xianbin
Tunnel Construction
Accepted: 04 February 2024
Select
Mechanical Analysis and Engineering Application of the Freezing Method for Clearing Obstacles under Existing Operating Stations in Water-rich Sand Layers#br#
ZHU Min, XU Chen, WANG Zihao
Tunnel Construction
Accepted: 29 January 2024
Select
Combined Application of Freezing Underground Under-cutting Method and Open-cut Method in Underground Passage Engineering
HE Tengfei, WANG Wenyuan
Tunnel Construction
Accepted: 29 January 2024
Select
Tunnel Construction
Accepted: 05 December 2023
Select
Tunnel Construction
Accepted: 05 December 2023
Select
Tunnel Construction
Accepted: 05 December 2023
Select
Design and Practice of Super Large Span Tunnel for Shenshanxi Extension Project#br#
LIANG Ganbo, YANG Baofeng, ZHU Xin
Tunnel Construction
Accepted: 21 November 2023
Select
Achievements and Prospects of Yunnan Highway Tunnel Construction#br#
LI Guofeng, LI Zhihou
Tunnel Construction
Accepted: 13 November 2023
Select
Field Test Research on the Influence of Construction on the Segment Floating of Large-Diameter Shield Tunnel#br#
HE Xiaobin, MA Shuai, CHEN Jian, LI Mingyu, YU Liucheng, HAO Jun
Tunnel Construction
Accepted: 09 November 2023
Select
Study on Support Timing of Mudstone-Sandstone Interbedded Tunnel in China-Laos Railway Based on Displacement Inversion#br#
XU Jianjun
Tunnel Construction
Accepted: 09 November 2023
Select
Key Technologies for Treating High Ground Stress and Large Deformation of Soft Rock in Daliangshan Tunnel of#br# Yunlin Expressway#br#
ZHENG Yong, GUO Ping, WANG Lijun, CHEN Xingyu, DUAN Xiaobin, WANG Anmin
Tunnel Construction
Accepted: 09 November 2023
Select
Optimisation of Excavation Sequence of Deep and Large Foundation Pit Zones in Urban Metro Station#br#
LIU Rui, FANG Chengcheng, CHU Zhumin, LI Meng
Tunnel Construction
Accepted: 09 November 2023
Select
Classification and Prospect for Large Deformation of Tunnel Surrounding Rock#br#
XU Chongbang, ZHENG Ziteng, XIN Hongsheng, MIU Yuanbing, DU Ju
Tunnel Construction
Accepted: 07 November 2023
Select
Research on hazard assessment model of water and mud outburst in karst tunnel based on interval number theory#br#
PENG Shaoyong, FENG Shichun, XU Han
Tunnel Construction
Accepted: 07 November 2023
Select
Construction risk assessment of shield tunnel crossing bridge pile foundation group based on FAHP-GRA method#br#
Wu Cheng, Zhang Bo, Lei Shasha, Yang Chuhan, Li Bin, Lu Feng, Zhang Junru
Tunnel Construction
Accepted: 07 November 2023
Select
Research on the Safety Thickness of Pre-grouting Curtain for Vertical Shaft Ground and Its Application in Tunnel Ventilation Shaft:Take the No. 4#br# Ventilation Shaft of Tianshan Shengli Tunnel as an Example#br#
MAO Jinbo, ZHAO Honggang, HAN Qiang, JI Zhongkui, ZHANG Binbin, LI Yalong
Tunnel Construction
Accepted: 07 November 2023
Select
Study of The Influence of Site Condition on The Seismic Fragility of Horseshoe-shaped Tunnels#br#
DUAN Chaojie, HE Zhijia, SHI Yanke, XU Lin, MEN Wenbo, CHEN Rongguo
Tunnel Construction
Accepted: 07 November 2023
Select
Practice and Reflection on the Design of Auxiliary Channels for Highway Tunnels in Yunnan Province#br#
ZHENG Yong, LI Hao, YIN Zhifeng, CHEN Junwu, HE Jun, ZHENG Xin
Tunnel Construction
Accepted: 07 November 2023
Select
Research and Application of Tunnel Emergency Positioning System Based on Beidou#br#
MA Tianyu, ZHANG Lixian, SU Zhou
Tunnel Construction
Accepted: 07 November 2023
Select
An Improved KNN Algorithm Method Using Finite Boreholes for Predicting Full-area Geological Features#br#
ZHU Junsheng, WANG Sheng, BAI Jun, XU Zhengxuan, CHEN Minghao, LI Zhaoqi, LIU Xin, ZHANG Zihao, LIU Xingyi
Tunnel Construction
Accepted: 03 November 2023
Select
Research and Application of Forward Modeling and Inversion of the Transient Electromagnetic Method for Engineering Geological Survey#br# in Shallow Water Areas#br#
LI Naibin, YUAN Zhenxiu, PEI Shijian
Tunnel Construction
Accepted: 10 October 2023
Select
Geological Risk Investigation and Evaluation of Tunnel Side Slopes in Difficult and Dangerous Mountain Areas#br#
CAI Jianhua, ZENG Jianxin, WANG Lijuan, LIU Huan, YANG Qiangguo
Tunnel Construction
Accepted: 10 October 2023
Select
Tunnel Construction
Accepted: 16 August 2023
Select
Tunnel Construction
Accepted: 16 August 2023
page
Page 1 of 5
Total 144 records
First page
Prev page
Next page
Last page
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat