Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2013, 33 (9) Published: 18 September 2013
Previous Issue
Next Issue
Back issue
Recommendations on Seismic Design of Tunnels and Underground Structures
YANG Linde
2013, 33(9): 707-714
DOI:
10.3973/j.issn.1672-741X.2013.09.001
Abstract
(
2521
)
PDF
(1933KB) (
1456
)
A Study on Producing Synchronous Grouting Materials Using Muck Collected in Shield Tunneling in Different Strata
LIN Wenshu, WANG Hongxi, PENG Bihui, XU Ke, WANG Biao, DING Qingjun
2013, 33(9): 715-719
DOI:
10.3973/j.issn.1672-741X.2013.09.002
Abstract
(
2277
)
PDF
(1332KB) (
651
)
Risk Analysis and Control Model for Shield Tunnel Based on Human Factors
ZHENG Xinding, WANG Hongwei, ZHOU Jian
2013, 33(9): 720-725
DOI:
10.3973/j.issn.1672-741X.2013.09.003
Abstract
(
2849
)
PDF
(1193KB) (
908
)
Application of Analytic Hierarchy Process (AHP) in the Selection of Excavation Methods for Shallow Tunnels
LI Baoping, GAO Shiming, WANG Rui, QIN Wei
2013, 33(9): 726-730
DOI:
10.3973/j.issn.1672-741X.2013.09.004
Abstract
(
2959
)
PDF
(1303KB) (
662
)
Fuzzy Evaluation of the Shield Docking Plan in the Construction of the Shiziyang Tunnel
WANG Lianshan, XI Zhengping
2013, 33(9): 731-734
DOI:
10.3973/j.issn.1672-741X.2013.09.005
Abstract
(
3238
)
PDF
(913KB) (
946
)
Numerical Optimization on the Selection of Excavation Methods for Deep Tunnels in High Stress Field and its Engineering Application
YANG Yanliang, LI Xibo, MAO Honglu
2013, 33(9): 735-740
DOI:
10.3973/j.issn.1672-741X.2013.09.006
Abstract
(
2977
)
PDF
(1303KB) (
1012
)
An Analysis on Causes for Cracks on the Inner Surface of Segments of Tunnel Bored by Double Shield Tunnel Boring Machine
SANG Wencai
2013, 33(9): 741-745
DOI:
10.3973/j.issn.1672-741X.2013.09.007
Abstract
(
2980
)
PDF
(1024KB) (
764
)
A Study on the Internal Force of the Longitudinal Beams of Metro Stations
YANG Hai
2013, 33(9): 746-750
DOI:
10.3973/j.issn.1672-741X.2013.09.008
Abstract
(
3010
)
PDF
(1183KB) (
921
)
Application of Insurance in the Construction Risk Management of Largescale Railway Projects
XIA Runhe
2013, 33(9): 751-756
DOI:
10.3973/j.issn.1672-741X.2013.09.009
Abstract
(
2919
)
PDF
(814KB) (
650
)
The Research, Development and Application of a 3D Production Information Management System
LI Zhijun, ZHAO Kanglin
2013, 33(9): 757-767
DOI:
10.3973/j.issn.1672-741X.2013.09.010
Abstract
(
3206
)
PDF
(3369KB) (
633
)
An Analysis and Design for the Treatment of Rock Falls at the Entrance Portal of Xiaopingdi Tunnel
LUO Zhangbo
2013, 33(9): 768-773
DOI:
10.3973/j.issn.1672-741X.2013.09.011
Abstract
(
2371
)
PDF
(2137KB) (
1071
)
Application of Concretefilled Steel Tube Support in the Repairing of 1 000 mdeep Roadway
WANG Jun, CHEN Feng, LIU Guolei, ZHANG Xizhong
2013, 33(9): 774-778
DOI:
10.3973/j.issn.1672-741X.2013.09.012
Abstract
(
2880
)
PDF
(1058KB) (
1028
)
Key Technologies for Shield Machine Passing through Piles under Box Culvert in Soft Fluidplastic Strata
PENG Hongxia, WANG Huaidong, GAO Shumei
2013, 33(9): 779-784
DOI:
10.3973/j.issn.1672-741X.2013.09.013
Abstract
(
2239
)
PDF
(1454KB) (
767
)
An Application of Relay Ventilation in the Construction of a Waterconveyance Tunnel
LIU Guoping
2013, 33(9): 785-790
DOI:
10.3973/j.issn.1672-741X.2013.09.014
Abstract
(
3296
)
PDF
(1175KB) (
986
)
A Case Study on How to Deal with Existing Bridge Piles in Shield Tunneling
LI Xingfa
2013, 33(9): 791-800
DOI:
10.3973/j.issn.1672-741X.2013.09.015
Abstract
(
2952
)
PDF
(2676KB) (
1221
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat