Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2018, 38 (9) Published:
Previous Issue
Next Issue
Back issue
Great Revolution in Maritime Transportation: Discussion on Preliminary Work and Operation Plan of Bridge/Tunnel Projects for Vacuum HTS Maglev Train at High Speed
孙钧, 刘子忠, 刘甲朋
2018, 38(9): 1405-1415
DOI:
10.3973/j.issn.2096-4498.2018.09.001
Abstract
(
947
)
PDF
(4458KB) (
1064
)
Discussion on Design and Construction Improvement Measures Based on Current Typical Diseases of Railway Tunnel Lining
XIAO Guangzhi
2018, 38(9): 1416-1422
DOI:
10.3973/j.issn.2096-4498.2018.09.002
Abstract
(
636
)
PDF
(1260KB) (
1317
)
Effective Measures for Green Construction of Utility Tunnel
YOU Xinhua, HUA Dong, WANG Hengdong
2018, 38(9): 1423-1427
DOI:
10.3973/j.issn.2096-4498.2018.09.003
Abstract
(
820
)
PDF
(1507KB) (
651
)
Prospects of Key Technologies of Rock Tunnel Boring Machine
WANG Yanjun, QI Mengxue
2018, 38(9): 1428-1434
DOI:
10.3973/j.issn.2096-4498.2018.09.004
Abstract
(
763
)
PDF
(1014KB) (
831
)
Influence of Interface Position of SoilSand Strata in Yangcheng Tunnel on Menghua Railway on Stability of Surrounding Rock
WANG Zhijie, LI Ruiyao, XU Haiyan, TANG Li, XU Junxiang, ZHOU Ping
2018, 38(9): 1435-1445
DOI:
10.3973/j.issn.2096-4498.2018.09.005
Abstract
(
756
)
PDF
(4372KB) (
579
)
Study of Risk Evaluation of Urban Underground Utility Tunnel PPP Project Based on GRASPA
WANG Jianbo, YOU Weibao, LIU Fangmeng, ZHANG Wei, YANG Diying
2018, 38(9): 1446-1455
DOI:
10.3973/j.issn.2096-4498.2018.09.006
Abstract
(
538
)
PDF
(1258KB) (
408
)
Application of Quantitative Theory Ⅲ and Limit Learning Machine to Analysis of Influencing Factors for Smallspacing Tunnel Deformation
ZHAO Shumin
2018, 38(9): 1456-1462
DOI:
10.3973/j.issn.2096-4498.2018.09.007
Abstract
(
633
)
PDF
(1037KB) (
320
)
Numerical Simulation of Mechanical Properties of Quasirectangular Shield Tail
WANG Xiaodun, WANG Bingyan, HUANG Dezhong, WEN Suolin, CHEN Zhihua
2018, 38(9): 1463-1470
DOI:
10.3973/j.issn.2096-4498.2018.09.008
Abstract
(
628
)
PDF
(2724KB) (
407
)
Study of Operation Optimization of Ventilation System for Urban Complex Extralong Tunnel
JIANG Xuepeng, MAO Yangsuyi, XIE Zhiyun
2018, 38(9): 1471-1479
DOI:
10.3973/j.issn.2096-4498.2018.09.009
Abstract
(
781
)
PDF
(1758KB) (
435
)
Numerical Simulation and Site Monitoring Analysis of Influence of Division Excavation of Foundation Pit on Adjacent Largediameter Rivercrossing Tunnel
ZHANG Zhiguo, XI Xiaoguang, WU Ling
2018, 38(9): 1480-1488
DOI:
10.3973/j.issn.2096-4498.2018.09.010
Abstract
(
666
)
PDF
(2858KB) (
448
)
Structural Safety Analysis of Reconstruction Section of Lining Cracking in High Geostress Soft Rock Tunnel
MA Zhaolin, JIAO Lei, ZHAO Shuang, HUANG Mingli
2018, 38(9): 1489-1496
DOI:
10.3973/j.issn.2096-4498.2018.09.011
Abstract
(
808
)
PDF
(2905KB) (
733
)
Study of Failure Calculation of Tunnel Face Based on Drawing Ellipsoid Theory
DU Jun, MEI Zhirong, CHEN Yongzhao
2018, 38(9): 1497-1504
DOI:
10.3973/j.issn.2096-4498.2018.09.012
Abstract
(
653
)
PDF
(1978KB) (
487
)
Study of Failure Pattern of Geotextile Bag with Sand Cofferdam of Immersed Tunnel in High Water Level Environment
YANG Chunshan, WEI Lixin, CHEN Lingwei, WANG Chuanzhi
2018, 38(9): 1505-1512
DOI:
10.3973/j.issn.2096-4498.2018.09.013
Abstract
(
637
)
PDF
(2107KB) (
544
)
Lifecycle Risk Evaluation for Qiongzhou Strait Railway Tunnel
WANG Han, HE Weiguo, YUAN Yong
2018, 38(9): 1513-1519
DOI:
10.3973/j.issn.2096-4498.2018.09.014
Abstract
(
731
)
PDF
(2623KB) (
456
)
超大跨度隧道围岩支护体系构件化设计方法及其应用研究
吕刚, 刘建友, 赵勇
2018, 38(9): 1520-1528
DOI:
10.3973/j.issn.2096-4498.2018.09.015
Abstract
(
822
)
PDF
(5204KB) (
924
)
Structural Design Scheme for Superdeep Foundation Pit with Highpressure Water Adjacent to Minjiang River in Fujian
SONG Jianyu
2018, 38(9): 1529-1537
DOI:
10.3973/j.issn.2096-4498.2018.09.016
Abstract
(
753
)
PDF
(3397KB) (
438
)
Risk Analysis and Countermeasures for Excavation of Deep Foundation Pit in Waterrich Composite Strata
ZHU Yuhong, CHEN Juwu, MA Hui, ZHAI Lihua
2018, 38(9): 1538-1545
DOI:
10.3973/j.issn.2096-4498.2018.09.017
Abstract
(
733
)
PDF
(1681KB) (
692
)
Influence Analysis of Blasting Treatment of Boulder and Bedrock on Driving Parameters of Slurry Shield
FENG Xiaoyan, ZHANG Wenxin, ZOU Chong
2018, 38(9): 1546-1553
DOI:
10.3973/j.issn.2096-4498.2018.09.018
Abstract
(
761
)
PDF
(1977KB) (
557
)
Study of Construction Technology for Diaphragm Wall under Complex Geological Conditions in Sea Cofferdam
ZHU Jihong, ZHANG Wenxin, ZHANG Lianghui
2018, 38(9): 1554-1559
DOI:
10.3973/j.issn.2096-4498.2018.09.019
Abstract
(
674
)
PDF
(1291KB) (
444
)
Study and Application of Raiseboring Method for Deep Vertical Shaft of Railway Tunnel Construction:A Case Study of Dangjinshan Tunnel
CHENG Shouye
2018, 38(9): 1560-1565
DOI:
10.3973/j.issn.2096-4498.2018.09.020
Abstract
(
667
)
PDF
(1172KB) (
850
)
直接铺管施工技术与应用
王乐
2018, 38(9): 1566-1572
DOI:
10.3973/j.issn.2096-4498.2018.09.021
Abstract
(
545
)
PDF
(3940KB) (
709
)
Application of Separate Launching Technology of Doubleshield TBM to Qingdao Metro Line No. 1
WANG Xiaoqiang, GUO Zhi, WANG Yidong, LI Changda, HAN Lisen, XU Chaoqun
2018, 38(9): 1573-1578
DOI:
10.3973/j.issn.2096-4498.2018.09.022
Abstract
(
1291
)
PDF
(1602KB) (
412
)
Experimental Study of Disc Cutter Abrasion of TBM Used in Qinling Tunnel of Hanjiang RiverWeihe River Water Conveyance Project with High Abrasive Hard Rock
CAI Yu, ZHU Heyi, YANG Xiaoyu, WEI Yuqi, XIA Ming
2018, 38(9): 1579-1584
DOI:
10.3973/j.issn.2096-4498.2018.09.023
Abstract
(
664
)
PDF
(1133KB) (
572
)
Research on Visualized Realtime Monitoring System for Soil Chamber of Composite Shield
LI Dongli, SUN Wei, ZHONG Qingfeng, MENG Xiangbo, GAO Ming, FENG Shuo
2018, 38(9): 1585-1590
DOI:
10.3973/j.issn.2096-4498.2018.09.024
Abstract
(
1344
)
PDF
(1932KB) (
485
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat