Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2018, 38 (8) Published: 20 August 2018
Previous Issue
Next Issue
Back issue
Research on Key Technology of Large Crosssectional Mechanized Construction of ZhengzhouWanzhou Highspeed Railway Tunnel
WANG Zhijian
2018, 38(8): 1257-1270
DOI:
10.3973/j.issn.2096-4498.2018.08.001
Abstract
(
964
)
PDF
(3597KB) (
1460
)
Study of Displacement Control Criterion for Largescale Mechanized Construction of Tunnels on ZhengzhouWanzhou Highspeed Railway
WANG Mingnian, ZHAO Siguang, ZHANG Xiao
2018, 38(8): 1271-1278
DOI:
10.3973/j.issn.2096-4498.2018.08.002
Abstract
(
709
)
PDF
(2681KB) (
648
)
Study of Theoretical Prediction Method for Construction Ventilation Time Required for Largesectional Highspeed Railway Tunnel
WANG Mingnian, DENG Tao, YU Li
2018, 38(8): 1279-1285
DOI:
10.3973/j.issn.2096-4498.2018.08.003
Abstract
(
750
)
PDF
(1611KB) (
571
)
Research on Optimization Methods for Structural Reliability Index of Tunnel Lining
GONG Yanfeng, CHEN Wenbo, FANG Qian
2018, 38(8): 1286-1292
DOI:
10.3973/j.issn.2096-4498.2018.08.004
Abstract
(
661
)
PDF
(2232KB) (
607
)
Study of Mechanical Characteristics of Primary Support of Soft Rock TunnelConstructed by Mechanized Fullsection Blasting Excavation Method
LI Shubing
2018, 38(8): 1293-1302
DOI:
10.3973/j.issn.2096-4498.2018.08.005
Abstract
(
1041
)
PDF
(2750KB) (
677
)
Study of Measurement and Distribution Characteristics of Surrounding Rock Stress of Large Crosssectional Highspeed Railway Tunnel with Mechanized Construction
YU Li, WANG Zhilong, YANG Nie
2018, 38(8): 1303-1310
DOI:
10.3973/j.issn.2096-4498.2018.08.006
Abstract
(
795
)
PDF
(1535KB) (
580
)
Stability Evaluation and Control Measures for Tunnel Face of Large Crosssectional Tunnel on ZhengzhouWanzhou Highspeed Railway
LIU Dagang, YAO Meng, ZHANG Xiao
2018, 38(8): 1311-1315
DOI:
10.3973/j.issn.2096-4498.2018.08.007
Abstract
(
662
)
PDF
(1316KB) (
842
)
Study of Mechanical Properties of Interaction between Surrounding Rock and Supporting Structure of ZhengzhouWanzhou Highspeed Railway Tunnel Constructed by Fullsection Method with Largescale Machinery
YU Li, CAI Minjin
2018, 38(8): 1316-1323
DOI:
10.3973/j.issn.2096-4498.2018.08.008
Abstract
(
804
)
PDF
(2741KB) (
685
)
Optimization of Support Design of Largescale Machanized Construction of ZhengzhouWanzhou Highspeed Railway Tunnel
JIN Qiangguo
2018, 38(8): 1324-1333
DOI:
10.3973/j.issn.2096-4498.2018.08.009
Abstract
(
685
)
PDF
(1565KB) (
556
)
Strengthened Mechanized Construction Management and Construction Efficiency Analysis of Large Crosssectional Tunnel
JIANG Yinzhou, SHEN Baitun
2018, 38(8): 1334-1341
DOI:
10.3973/j.issn.2096-4498.2018.08.010
Abstract
(
1449
)
PDF
(1747KB) (
615
)
Application of Tripleboom Rock Drilling Jumbo to Weak Surrounding Rock Construction of ZhengzhouWanzhou Highspeed Railway Tunnel
ZHAO Hongbo, LU Wei
2018, 38(8): 1342-1349
DOI:
10.3973/j.issn.2096-4498.2018.08.011
Abstract
(
1198
)
PDF
(1518KB) (
990
)
Application of Mechanized Construction Method to Large Crosssectional Tunnel with Soft Surrounding Rocks
TIAN Jia, LI Jinpeng
2018, 38(8): 1350-1360
DOI:
10.3973/j.issn.2096-4498.2018.08.012
Abstract
(
1300
)
PDF
(1874KB) (
695
)
Discussion on Largescale Mechanized Matching and Its Informatied Application to ZhengzhouWanzhou Highspeed Railway Tunnel Construction
LIN Yi, WANG Lijun, JIANG Jun
2018, 38(8): 1361-1370
DOI:
10.3973/j.issn.2096-4498.2018.08.013
Abstract
(
1681
)
PDF
(1904KB) (
1342
)
Experimental Construction Technology of Conventional Mechanized Support for Weak Surrounding Rock in Gufu Tunnel
LI Yang, MA Liuchuang, WANG Feng
2018, 38(8): 1371-1378
DOI:
10.3973/j.issn.2096-4498.2018.08.014
Abstract
(
659
)
PDF
(1770KB) (
449
)
Design of Automatic Matching System for Drilling Parameters Based on Propulsion Pressure Difference and Rotary Pressure Variation
LIU Zaizheng, LIAO Jinjun, HU Qian
2018, 38(8): 1379-1383
DOI:
10.3973/j.issn.2096-4498.2018.08.015
Abstract
(
766
)
PDF
(1426KB) (
425
)
Research and Application of A New Type of Digital Tunnel Lining Trolley with Pressured Casting
JI Haidong, LIU Zaizheng, ZHANG Haitao
2018, 38(8): 1384-1390
DOI:
10.3973/j.issn.2096-4498.2018.08.016
Abstract
(
797
)
PDF
(2352KB) (
704
)
Research on Intelligent Control System and Path Planning of Spraying Manipulator
LIU Zaizheng, QIN Nianwen, ZOU Jinjian, LI Jianhua
2018, 38(8): 1391-1396
DOI:
10.3973/j.issn.2096-4498.2018.08.017
Abstract
(
845
)
PDF
(1317KB) (
807
)
Design and Application of Full Process Crawlertype Invert Trestle Used in Highspeed Railway Tunnel
XUE Jiangsong, LI Jinpeng
2018, 38(8): 1397-1404
DOI:
10.3973/j.issn.2096-4498.2018.08.018
Abstract
(
889
)
PDF
(1563KB) (
866
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat