Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2019, 39 (9) Published: 20 September 2019
Previous Issue
Next Issue
Back issue
Fullscale Experimental Study on Structural Mechanism of Tconnected Tunnel Constructed by Pipe Jacking Method
ZHU Yaohong, GAO Yimin, DONG Zibo, LIU Xian
2019, 39(9): 1392-1401
DOI:
10.3973/j.issn.2096-4498.2019.09.002
Abstract
(
618
)
PDF
(3936KB) (
577
)
Experimental Study on Waterproof Performance of Embedded Sealing Gasket of Segment Joint For a Shield Tunnel
ZHANG Zixin, GU Guansi, HUANG Xin, ZHANG Jiaqi, ZHANG Chi
2019, 39(9): 1402-1411
DOI:
10.3973/j.issn.2096-4498.2019.09.003
Abstract
(
490
)
PDF
(4791KB) (
444
)
Optimization of Crosssection of Extralong Tunnel Based on Aerodynamic Effect
MA Hui, WU Jian, GAO Mingzhong, WANG Haiyun
2019, 39(9): 1412-1422
DOI:
10.3973/j.issn.2096-4498.2019.09.004
Abstract
(
481
)
PDF
(3126KB) (
400
)
Influence of Pipeline Laying and Fan Room Arrangement on Ventilation Resistance of Utility Tunnel
MIN Xuan, ZHANG Zhengwei, ZOU Jianming, WAN Lei, HATAYSAL Ertan, ZHAO Libo
2019, 39(9): 1423-1430
DOI:
10.3973/j.issn.2096-4498.2019.09.005
Abstract
(
427
)
PDF
(7140KB) (
409
)
Development and Application of Doubleleaf Airtight Blast Partition Door for Singletube Singletrack Metro Tunnel
ZHANG Jianwei, CUI Yanbin, JIA Yanming, HU Shengwei
2019, 39(9): 1431-1436
DOI:
10.3973/j.issn.2096-4498.2019.09.006
Abstract
(
477
)
PDF
(1987KB) (
480
)
Influence of Pipe Roof Layout Range on Stability of Surrounding Rock of Soft Rock Tunnel
DAI Cong, HE Chuan, LIU Chuankun, GUO Wenqi
2019, 39(9): 1437-1444
DOI:
10.3973/j.issn.2096-4498.2019.09.007
Abstract
(
440
)
PDF
(2867KB) (
709
)
Safety Evaluation of Tunnel Primary Support Based on DeformationStructure Method
YANG Nie, LIU Dagang, WANG Mingnian, YU Li
2019, 39(9): 1445-1452
DOI:
10.3973/j.issn.2096-4498.2019.09.008
Abstract
(
401
)
PDF
(2116KB) (
427
)
Influence of Shield Tunneling Construction Load on Waterproofing Performance of Small Radius Curved Tunnel Segments
WANG Hongying, XIAN Qingyu, LIU Dagang, ZHANG Qiankun, LIU Yuguo, LIU Zhijie
2019, 39(9): 1453-1460
DOI:
10.3973/j.issn.2096-4498.2019.09.009
Abstract
(
398
)
PDF
(3548KB) (
364
)
Numerical Simulation of Reinforcement Load Reduction for Highfilled Opencut Tunnel Based on Particle Flow
YAO Yuxiang, LI Sheng, MA Li, WANG Huan, WANG Changdan
2019, 39(9): 1461-1470
DOI:
10.3973/j.issn.2096-4498.2019.09.010
Abstract
(
377
)
PDF
(3841KB) (
384
)
Innovations and Thinking on Design of Wuhan Optics Valley Square Underground Traffic Complex
XIONG Zhaohui, ZHOU Bing, HE Cong
2019, 39(9): 1471-1479
DOI:
10.3973/j.issn.2096-4498.2019.09.011
Abstract
(
577
)
PDF
(8364KB) (
1484
)
Section Design of Utility Tunnel
QIANG Jian, WANG Hengdong, QI Feng
2019, 39(9): 1480-1485
DOI:
10.3973/j.issn.2096-4498.2019.09.012
Abstract
(
822
)
PDF
(698KB) (
627
)
扎尕梁特长公路隧道通风方案比选研究
李志鹏
2019, 39(9): 1486-1493
DOI:
10.3973/j.issn.2096-4498.2019.09.013
Abstract
(
422
)
PDF
(1565KB) (
395
)
Key Technologies for Design and Construction of Huangshanshao Tunnel on LijiangShangrila Railway Crossing underneath Rockpile Section
LI Guimin
2019, 39(9): 1494-1499
DOI:
10.3973/j.issn.2096-4498.2019.09.014
Abstract
(
681
)
PDF
(2240KB) (
568
)
Application of Stepping without Load Technology of Open TBM to Songhua River Water Diversion Project
WANG Haijun
2019, 39(9): 1500-1506
DOI:
10.3973/j.issn.2096-4498.2019.09.015
Abstract
(
435
)
PDF
(2947KB) (
475
)
Information Addition, Tracking and Integration of Construction Schedule Based on BIM: a Case Study of Ping′anli Station on Beijing Rail Transit Line No. 19
ZHANG Kangning, LIU Zhiwei
2019, 39(9): 1507-1514
DOI:
10.3973/j.issn.2096-4498.2019.09.016
Abstract
(
442
)
PDF
(4777KB) (
669
)
TBM Technologies in Bad Geology of a Tunnel Project
LIU Feixiang, YU Yang
2019, 39(9): 1515-1522
DOI:
10.3973/j.issn.2096-4498.2019.09.017
Abstract
(
455
)
PDF
(3847KB) (
857
)
Management Mode Analysis of Equipment Procurement and Construction Process of TBM Clustering Construction Project: a Case Study of Liaoning Key Water Supplying Project
LI Xiaohan
2019, 39(9): 1523-1529
DOI:
10.3973/j.issn.2096-4498.2019.09.018
Abstract
(
425
)
PDF
(463KB) (
330
)
Application of Composite Highangle Belt Conveyor to Metro Construction
QI Mengxue, CHE Xinning, LI Xiuyun
2019, 39(9): 1530-1536
DOI:
10.3973/j.issn.2096-4498.2019.09.019
Abstract
(
490
)
PDF
(3558KB) (
478
)
A New Type of Informatized Lining Trolley Based on Control Method of Lining Disease in ZhangjiajieJishouHuaihua Railway Tunnel and Its Application
CHEN Wenyi, SHANG Wei
2019, 39(9): 1537-1544
DOI:
10.3973/j.issn.2096-4498.2019.09.020
Abstract
(
1339
)
PDF
(4438KB) (
555
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat