Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2019, 39 (9) Published:
Previous Issue
Next Issue
Back issue
Fullscale Experimental Study on Structural Mechanism of Tconnected Tunnel Constructed by Pipe Jacking Method
ZHU Yaohong, GAO Yimin, DONG Zibo, LIU Xian
2019, 39(9): 1392-1401
DOI:
10.3973/j.issn.2096-4498.2019.09.002
Abstract
(
777
)
PDF
(3936KB) (
626
)
Experimental Study on Waterproof Performance of Embedded Sealing Gasket of Segment Joint For a Shield Tunnel
ZHANG Zixin, GU Guansi, HUANG Xin, ZHANG Jiaqi, ZHANG Chi
2019, 39(9): 1402-1411
DOI:
10.3973/j.issn.2096-4498.2019.09.003
Abstract
(
713
)
PDF
(4791KB) (
484
)
Optimization of Crosssection of Extralong Tunnel Based on Aerodynamic Effect
MA Hui, WU Jian, GAO Mingzhong, WANG Haiyun
2019, 39(9): 1412-1422
DOI:
10.3973/j.issn.2096-4498.2019.09.004
Abstract
(
622
)
PDF
(3126KB) (
433
)
Influence of Pipeline Laying and Fan Room Arrangement on Ventilation Resistance of Utility Tunnel
MIN Xuan, ZHANG Zhengwei, ZOU Jianming, WAN Lei, HATAYSAL Ertan, ZHAO Libo
2019, 39(9): 1423-1430
DOI:
10.3973/j.issn.2096-4498.2019.09.005
Abstract
(
563
)
PDF
(7140KB) (
448
)
Development and Application of Doubleleaf Airtight Blast Partition Door for Singletube Singletrack Metro Tunnel
ZHANG Jianwei, CUI Yanbin, JIA Yanming, HU Shengwei
2019, 39(9): 1431-1436
DOI:
10.3973/j.issn.2096-4498.2019.09.006
Abstract
(
608
)
PDF
(1987KB) (
497
)
Influence of Pipe Roof Layout Range on Stability of Surrounding Rock of Soft Rock Tunnel
DAI Cong, HE Chuan, LIU Chuankun, GUO Wenqi
2019, 39(9): 1437-1444
DOI:
10.3973/j.issn.2096-4498.2019.09.007
Abstract
(
555
)
PDF
(2867KB) (
735
)
Safety Evaluation of Tunnel Primary Support Based on DeformationStructure Method
YANG Nie, LIU Dagang, WANG Mingnian, YU Li
2019, 39(9): 1445-1452
DOI:
10.3973/j.issn.2096-4498.2019.09.008
Abstract
(
548
)
PDF
(2116KB) (
456
)
Influence of Shield Tunneling Construction Load on Waterproofing Performance of Small Radius Curved Tunnel Segments
WANG Hongying, XIAN Qingyu, LIU Dagang, ZHANG Qiankun, LIU Yuguo, LIU Zhijie
2019, 39(9): 1453-1460
DOI:
10.3973/j.issn.2096-4498.2019.09.009
Abstract
(
555
)
PDF
(3548KB) (
393
)
Numerical Simulation of Reinforcement Load Reduction for Highfilled Opencut Tunnel Based on Particle Flow
YAO Yuxiang, LI Sheng, MA Li, WANG Huan, WANG Changdan
2019, 39(9): 1461-1470
DOI:
10.3973/j.issn.2096-4498.2019.09.010
Abstract
(
530
)
PDF
(3841KB) (
413
)
Innovations and Thinking on Design of Wuhan Optics Valley Square Underground Traffic Complex
XIONG Zhaohui, ZHOU Bing, HE Cong
2019, 39(9): 1471-1479
DOI:
10.3973/j.issn.2096-4498.2019.09.011
Abstract
(
756
)
PDF
(8364KB) (
1520
)
Section Design of Utility Tunnel
QIANG Jian, WANG Hengdong, QI Feng
2019, 39(9): 1480-1485
DOI:
10.3973/j.issn.2096-4498.2019.09.012
Abstract
(
949
)
PDF
(698KB) (
659
)
扎尕梁特长公路隧道通风方案比选研究
李志鹏
2019, 39(9): 1486-1493
DOI:
10.3973/j.issn.2096-4498.2019.09.013
Abstract
(
575
)
PDF
(1565KB) (
438
)
Key Technologies for Design and Construction of Huangshanshao Tunnel on LijiangShangrila Railway Crossing underneath Rockpile Section
LI Guimin
2019, 39(9): 1494-1499
DOI:
10.3973/j.issn.2096-4498.2019.09.014
Abstract
(
857
)
PDF
(2240KB) (
598
)
Application of Stepping without Load Technology of Open TBM to Songhua River Water Diversion Project
WANG Haijun
2019, 39(9): 1500-1506
DOI:
10.3973/j.issn.2096-4498.2019.09.015
Abstract
(
591
)
PDF
(2947KB) (
517
)
Information Addition, Tracking and Integration of Construction Schedule Based on BIM: a Case Study of Ping′anli Station on Beijing Rail Transit Line No. 19
ZHANG Kangning, LIU Zhiwei
2019, 39(9): 1507-1514
DOI:
10.3973/j.issn.2096-4498.2019.09.016
Abstract
(
556
)
PDF
(4777KB) (
722
)
TBM Technologies in Bad Geology of a Tunnel Project
LIU Feixiang, YU Yang
2019, 39(9): 1515-1522
DOI:
10.3973/j.issn.2096-4498.2019.09.017
Abstract
(
605
)
PDF
(3847KB) (
891
)
Management Mode Analysis of Equipment Procurement and Construction Process of TBM Clustering Construction Project: a Case Study of Liaoning Key Water Supplying Project
LI Xiaohan
2019, 39(9): 1523-1529
DOI:
10.3973/j.issn.2096-4498.2019.09.018
Abstract
(
567
)
PDF
(463KB) (
369
)
Application of Composite Highangle Belt Conveyor to Metro Construction
QI Mengxue, CHE Xinning, LI Xiuyun
2019, 39(9): 1530-1536
DOI:
10.3973/j.issn.2096-4498.2019.09.019
Abstract
(
655
)
PDF
(3558KB) (
524
)
A New Type of Informatized Lining Trolley Based on Control Method of Lining Disease in ZhangjiajieJishouHuaihua Railway Tunnel and Its Application
CHEN Wenyi, SHANG Wei
2019, 39(9): 1537-1544
DOI:
10.3973/j.issn.2096-4498.2019.09.020
Abstract
(
1458
)
PDF
(4438KB) (
601
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat