ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2019, Vol. 39 ›› Issue (9): 1500-1506.DOI: 10.3973/j.issn.2096-4498.2019.09.015

Previous Articles     Next Articles

Application of Stepping without Load Technology of Open TBM to Songhua River Water Diversion Project

WANG Haijun   

  1. (China Railway Tunnel Stock Co., Ltd., Zhengzhou 450001, Henan, China)
  • Received:2018-08-06 Online:2019-09-20 Published:2019-09-25

Abstract:

The tunnel in Bid Section No. 4 of Songhua River Water Diversion Project is mainly constructed by open TBM. The drilling and blasting construction is adopted to some tunnel sections to save construction time, where the TBM passes through without load. In order to guarantee the rapid and safe stepping of TBM in the circular drilling and blasting section, the influence factors are analyzed, and the construction methods and quality control measures of arc bottom plate of drilling and blasting section, as well as the solutions to the problems of TBM during stepping process, such as gripper can not support the cave wall or breaks the cave wall, floor breaking and uneven bottom height, are studied. The adaptability, advantages and disadvantages of two kinds of stepping methods are summarized by comparative analysis with slidingtype stepping technology.

Key words: open TBM, Songhua River Water Diversion Project, stepping without load technology, slidingtype stepping technology