• 中国科学引文数据库(CSCD)核心期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国权威学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2012, Vol. 32 ›› Issue (6): 843-848.DOI: 10.3973/j.issn.1672-741X.2012.06.017

• 规划与设计 • 上一篇    下一篇

上海长江隧道联络通道冻结优化设计研究

杨超1,岳丰田2   

  1. (1.中交第二公路勘察设计研究院有限公司,武汉 430056;2.中国矿业大学,江苏徐州 221008)
  • 收稿日期:2012-05-11 修回日期:2012-08-02 出版日期:2012-12-20 发布日期:2012-12-28
  • 作者简介:杨超(1983—),男,安徽滁州人,2009年毕业于中国矿业大学桥梁与隧道工程专业,硕士,工程师,主要从事地下工程及冻结方面的设计、研究工作。

Study on Freezing in Construction of Connection Galleries of  Yangtze Rivercrossing Tunnel in Shanghai

YANG Chao1, YUE Fengtian2   

  1. (1.CCCC Second Highway Consultants Co., Ltd., Wuhan 430056, China;  2. China University of Mining and Technology, Xuzhou 221008, Jiangsu, China)
  • Received:2012-05-11 Revised:2012-08-02 Online:2012-12-20 Published:2012-12-28

摘要: 上海长江隧道共设置8条联络通道,全部采用冻结法施工。为了优化联络通道的冻结设计参数,通过对1#联络通道冻结过程的现场实测,分析冻土帷幕厚度、冻土平均温度、开挖面温度等参数的演化规律;以冻结效率为考察指标指出了原冻结方案的不足之处,并提出联络通道冻结设计的优化方案;运用数值计算方法模拟了采用优化方案时联络通道的冻结温度场发展过程,并以采用优化方案的5#联络通道的冻结实测数据为例,对比分析了优化方案的冻结效果。实践表明,优化方案下形成的冻土帷幕有效厚度大、平均温度低、冻结效率更高。对冻结方案的优化设计为后续7个联络通道冻结施工的安全性、经济性提供了重要保障。

关键词: 优化设计, 冻结法, 监测, 联络通道, 上海长江隧道

Abstract: The 8 connection galleries of Yangtze Rivercrossing tunnel in Shanghai are constructed by freezing method. In the paper, analysis is made on the development rules of the thickness of frozen soil curtain, the average temperature of frozen soil and the temperature of excavation face, on basis of the results of monitoring made during freezing of No. 1 connection gallery. The disadvantages of the original freezing program are discussed and optimized freezing program is proposed. Numerical simulation is made on the development of the temperature field of the optimized freezing program. The freezing effect of the optimized freezing program is analyzed. The practice shows that the optimized freezing program has advantages such as large effective thickness of frozen soil curtain, low average temperature and high freezing efficiency. The study guarantees safe and economic freezing of the other 7 connection galleries.

Key words: design optimization, freezing method, monitoring, connecting gallery, Yangtze Rivercrossing tunnel in Shanghai