With the expansion of scale of the tunnels constructed by TBM, more and more bad geological conditions such as extremelystrong rockburst, serious rock broken, large deformation, etc. are encountered inevitably, which would greatly affect the construction safety, schedule, cost and investment of TBM. In this paper, the construction technology and management of TBM boring in extremelybad geological conditions are studied and analyzed based on bad geology that would be encountered and TBM construction experience; the geological exploration, general planning and design of project, construction technology and management are studied; and suggestions and countermeasures, i.e. advanced geological prediction, timely primary supporting, advanced treatment, construction schedule and investment control, relevant standard improvement, etc., are proposed. The results can promote the scientific and continuous development of TBM method.
Key words: TBM, extremelybad geology, geological exploration, advanced geological prediction, construction planning and design, advanced treatment, construction management
CLC Number:
U 455.43
QI Mengxue. Discussion on Construction Technology and Management of TBM Boring in Extremelybad Geological Conditions[J]. Tunnel Construction, 2018, 38(12): 2013-2018.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.12.013
http://www.suidaojs.com/EN/Y2018/V38/I12/2013
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink