[1] |
XU Huaguo, CHEN Kui, SUN Zhenchuan.
Laboratory Test of Reinforced Concrete Pile Foundation Cutting by Shield Cutterhead
[J]. Tunnel Construction, 2020, 40(1): 35-42.
|
[2] |
CHEN Qiao, SUN Zhenchuan, ZHANG Bing, WANG Chaofeng, YANG Jiangxiao, WANG Famin .
Parameters Control Method for Thrust System of Super-large Diameter Shield Boring in Soft Soil Layer of Sea Area: a Case Study o f Shantou Bay Tunnel Project
[J]. Tunnel Construction, 2020, 40(1): 126-133.
|
[3] |
DIAO Zhigang, CHEN Qindong, WANG Zhiyong.
Construction Technology of Shield Hoisting Shaft of Foundation Pit in Pit: a Case Study on Donghaochong Test Section of Guangzhou Deep Tunnel Drainage System
[J]. Tunnel Construction, 2019, 39(S2): 335-344.
|
[4] |
ZHANG Zhaotai, YOU Sheng, FENG Guangliang, CHEN Zhu, CHEN Bingrui.
Construction Technologies of Open TBM in Deepburied Rockburst Section with Soft and Hard Alternant Strata
[J]. Tunnel Construction, 2019, 39(5): 843-850.
|
[5] |
WANG Shaohua, LIU Quansheng, HUANG Xing, ZHANG Xiaobo.
Realtime Force Monitoring Method for Disc Cutter in TBM Tunneling
[J]. Tunnel Construction, 2019, 39(2): 309-316.
|
[6] |
ZHAI Qianzhi, ZHOU Jianjun, LI Hongbo, WANG Liming.
A Case Study on Double-shield TBM Disc Cutter Wear and Replacement Estimation
[J]. Tunnel Construction, 2019, 39(12): 2081-.
|
[7] |
QIN Yinping, ZHANG Zhuqing, SUN Zhenchuan, CHEN Kui, YANG Yandong.
Analysis and Prediction of TBM Disc Cutter Wear Based on Field Test
[J]. Tunnel Construction, 2019, 39(11): 1914-.
|
[8] |
YUAN Libin, LIU Jie, ZHAO Hong, YANG Zhiyong, XU Chao.
Wear Law and Life Prediction of Disc Cutter of Shield in Waterrich Pebble Drift Ground
[J]. Tunnel Construction, 2019, 39(10): 1712-1719.
|
[9] |
LI Fengyuan, CHEN Qiao, FENG Huanhuan.
Experimental Research on Rock Breaking by Typical Disc Cutters in Bedrock Protrusion Section of Subsea Tunnel
[J]. Tunnel Construction, 2019, 39(10): 1720-1727.
|
[10] |
XUE Yadong, LIAN Xu, LI Xing, ZHOU Jie.
Experimental Study of Rock Vibration Characteristics Induced by Disc Cutter Rock Breaking
[J]. Tunnel Construction, 2018, 38(S2): 337-344.
|
[11] |
CHEN Jian.
Research on Disc Cutter and Gear Cutter Replacement Technology forLarge Diameter Slurry Shield under Atmospheric Pressure in Composite Strata
[J]. Tunnel Construction, 2018, 38(S1): 175-181.
|
[12] |
YANG Yu.
Prediction of Disc Cutter Wear of Shield Used in Seacrossing Section on Xiamen Rail Transit Line No. 3
[J]. Tunnel Construction, 2018, 38(S1): 182-187.
|
[13] |
YAN Changbin, JIANG Xiaodi, YANG Jihua, GUO Weixin, YAO Yang.
Prediction of TBM Cutter Consumption Considering Geological Suitability and Disc Cutter Diameter
[J]. Tunnel Construction, 2018, 38(7): 1243-1250.
|
[14] |
CUI Yin, HE Fei, QI Zhichong, HE Kaiwei.
Comparative Analysis and Evaluation of DifferentDisc Cutter Layout Schemes for TBM
[J]. Tunnel Construction, 2018, 38(3): 474-480.
|
[15] |
HE Fei, TIAN Yanchao, SHANG Yong, MA Hongsu, YIN Lijun.
Experimental Research on Fullscale Linear Cutting of Granite by TBM Disc Cutters
[J]. Tunnel Construction, 2018, 38(12): 2063-2070.
|