ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 187-191.DOI: 10.3973/j.issn.1672-741X.2015.S2.034
Previous Articles Next Articles
HE Dongze
Received:
Revised:
Online:
Published:
Abstract:
Doubleshield TBM has lots of advantageous when boring in homogeneous hard rocks. Jamming will often occur to TBM when boring in soft and weak rocks and fault and fracture zone. In this paper, the working situation of main drive of TBM is presented, the parameters of main drive performance is analyzed and tested, and the improvement scheme of performance of main drive of the TBM is proposed. The adaptability of the TBM is greatly improved, and TBM jamming problem is solved. The paper can provide reference for TBM remanufacturing in the future.
Key words: doubleshield TBM, cutterhead, main drive, adaptability, performance, analysis and testing, improvement
CLC Number:
U 45
HE Dongze. Discussion on Improvement of Performance of Main Drive of DS1217-303-1Doubleshield TBMs[J]. Tunnel Construction, 2015, 35(S2): 187-191.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S2.034
http://www.suidaojs.com/EN/Y2015/V35/IS2/187
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition