[1] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[2] |
陈伟乐, 宋神友, 金文良, 夏丰勇.
Plan and Practice of Intelligent Construction System of SteelConcreteSteel Composite Immersed Tunnel of ShenzhenZhongshan Link
[J]. Tunnel Construction, 2020, 40(4): 465-474.
|
[3] |
WANG Jingchun, XUE Jialong, HUANG Wenhua, LIU Chao, CHEN Sibo.
Modification and Application of Nemerow Index in Influence Assessment of
Tunnel Construction on Scenic Spot Environment
[J]. Tunnel Construction, 2020, 40(4): 475-480.
|
[4] |
陈 越, 陈伟乐, 宋神友, 刘 健, 金文良.
深中通道沉管隧道主要建造技术
[J]. Tunnel Construction, 2020, 40(4): 603-610.
|
[5] |
LI Hongzhe, JIANG Guodong, ZHANG Guozhu, LIU Yiping.
Consideration on Common Diseases of Immersed Tunnel and Its Inspection and Maintenance
[J]. Tunnel Construction, 2019, 39(S1): 465-470.
|
[6] |
WANG Min, LIU Xiaodong, HAO Zengheng, LYU Yonggang.
Structure Design and Application of Asphalt Pavement to Hong KongZhuhaiMacao Bridge Immersed Tunnel
[J]. Tunnel Construction, 2019, 39(5): 802-809.
|
[7] |
LIN Yonggui, YANG Chunshan.
Support Scheme Evaluation and Influencing Factors on Cellular Diaphragm Wall for Drydock Foundation of Immersed Tunnel
[J]. Tunnel Construction, 2019, 39(4): 571-575.
|
[8] |
WANG Fei.
Combined Prediction Analysis and Safety Evaluation of Foundation Pit Deformation
[J]. Tunnel Construction, 2019, 39(2): 204-210.
|
[9] |
WEN Zhe, YANG Guosheng.
Application of Maritime Navigation System in Floating, Sinking and Jointing of Pipe Joint
[J]. Tunnel Construction, 2018, 38(S2): 285-291.
|
[10] |
SUN Xudong, LI Zhijun, XIE Haijin.
Application Study of PPP Financing Mode to Urban Infrastructure Projects: A Case Study of Honggu Tunnel in Nanchang
[J]. Tunnel Construction, 2018, 38(S1): 28-31.
|
[11] |
LIU Liying, WEI Lixin, HUANG Xueyang, YANG Chunshan.
Reliability Analysis on Current Force and Bitts in Process of Floating Variable Crosssection of Immersed Tunnel
[J]. Tunnel Construction, 2018, 38(S1): 45-50.
|
[12] |
YANG Chunshan, WEI Lixin, CHEN Lingwei, WANG Chuanzhi.
Study of Failure Pattern of Geotextile Bag with Sand Cofferdam of Immersed Tunnel in High Water Level Environment
[J]. Tunnel Construction, 2018, 38(9): 1505-1512.
|
[13] |
SHEN Ke, WEI Lixin, LIU Tingjin, YANG Chunshan.
Mechanical Response of Adjacent Metro Tunnel Subjected to Blasting Excavation of Foundation Trench of Immersed Tunnel
[J]. Tunnel Construction, 2018, 38(6): 901-906.
|
[14] |
WANG Dongwei, DAI Xin, LI Guojiang.
Research on Ventilation and Smoke Exhausting Organization of Underwater Interchange of Honggu Tunnel in Nanchang
[J]. Tunnel Construction, 2018, 38(6): 992-999.
|
[15] |
WANG Jianbo, YOU Weibao, LIU Fangmeng, ZHANG Wei, YANG Diying.
Study of Risk Assessment of Urban Rail Transit PPP Project Based on Improved Entropy Weight and Grey Theory
[J]. Tunnel Construction, 2018, 38(5): 732-739.
|