ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (4): 72-73.DOI: B

• wenzhang • Previous Articles     Next Articles

Control Essentials of Metro Survey

HE Xiao-Hui   

  1. China Railway Tunnel Survey &|Design Institute Co., Ltd.
  • Received:2006-09-13 Revised:2006-11-06 Online:2007-08-20 Published:2009-12-04

Abstract:

The paper presents the essentials of the surface plan control survey of Metro works, the method of shaft relation survey and related recommendations, the adjustment principle of underground plan control network and the features of the tracklaying base mark survey, which can provide reference for the concerned persons to perform effective control in the critical survey stages so as to guarantee the works quality.

Key words:  , Metro survey feature difficulty control essentials

CLC Number: