ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (5): 496-498,547.DOI: A
• wenzhang • Previous Articles Next Articles
LUO ZHan-Fu
Received:
Online:
Published:
Abstract:
West Route of SouthtoNorth Water Transfer Project, located on QinghaiTibet Plateau, has a 320kmlong water transfer route. The construction ventilation of the extralong tunnels of the project is a great concern. So far there is no health standards available in China dedicated for the construction environment in tunnels on high plateaus. If the health standards for tunnels on plain were adopted for tunnels on high plateaus, where the atmospheric pressure is low and the oxygen is insufficient, the health of the workers would be jeopardized. Health standards for the construction environment in tunnels on high plateaus are proposed on basis of the climatic characteristics of high plateaus and the existing health standards for tunnels specified in Chinese and foreign specifications. The proposed health standards can provide reference for the construction of tunnels on West Route of SouthtoNorth Water Transfer Project.
Key words: southtonorth water transfer project, west route, tunnel on plateau, extralong tunnel, construction ventilation, health standard
CLC Number:
 
R 134
LUO ZHan-Fu. Study on Health Standards of Working Environment in Extralong Tunnels on West Route of SouthtoNorth Water Transfer Project[J]. Tunnel Construction, 2009, 29(5): 496-498,547.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2009/V29/I5/496