The application of 3boom hydraulic rock drilling jumbos in construction of Jiaozhou Bay subsea tunnel in Qingdao is analyzed. The advantages of 3boom hydraulic rock drilling jumbos, such as large working scope, high flexibility, low dust pollution, high safety and civilization level, and high efficiency of hydraulic impact drills, are brought into full play. 3boom hydraulic rock drilling jumbos not only have obvious advantages in Grade II and Grade III surrounding rocks, but also can be used in Grade Ⅳ and Grade Ⅴ surrounding rocks. 3boom hydraulic rock drilling jumbos have achieved high speed, high quality, high safety and high efficiency in the project.
Key words: Jiaozhou Bay subsea tunnel in Qingdao, 3boom hydraulic rock drilling jumbo, drilling and blasting, full face curtain grouting
SHU Qin-Sheng. Study on Application of 3boom Hydraulic Rock Drilling Jumbos in Construction of Jiaozhou Bay Subsea Tunnel in Qingdao[J]. Tunnel Construction, 2010, 30(6): 670-674.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/I6/670
Noise Propagation Characteristics of Tunnel Construction by Drilling and Blasting Method