Abstract:
As a main method to cope with highpressure waterrich fault zones, advance grouting can seal ground water gushing, reinforce fractured surrounding rocks, control construction risks and protect surrounding environment. Advance grouting, however, is not the favorite method to be adopted in complex stratum, due to its long time duration and high cost. An innovative design concept of informationaided grouting is proposed on basis of the design concept of traditional advance grouting. Grouting equipment matching, grouting method, grouting material and grouting effect assessment of the innovative method are systematically studied. In the end, rapid grouting is guaranteed in highpressure waterrich fault zones.
Key words: advance grouting, informationaided grouting, equipment matching, sulphoaluminate cement, inhole photography technology
LIU Zheng-Mao. Rapid Advance Grouting Technology in Highpressure Waterrich Fault Zones[J]. Tunnel Construction, 2011, 31(3): 359-363.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I3/359
Key Technology for Water Blocking and Grouting Construction in Chamber of Bottom Car Yard of Microcrack Vertical Shafts Under Extremely
High Water Pressure: A Case Study of Vertical Shaft No. 1 of Gaoligongshan Tunnel on DaliRuili Railway