Tunnel Construction ›› 2011, Vol. 31 ›› Issue (5): 605-609.
• wenzhang • Previous Articles Next Articles
ZHENG Qingjun
Received:
Revised:
Online:
Published:
Abstract: Critical risk factors, such as hyperbaric operation, operation under atmospheric pressure, slurry system and shield tail seal, of the construction of Shiziyang tunnel on GuangzhouShenzhenHong Kong passengerdedicated railway are analyzed. Countermeasures and key safety control points are proposed, which eliminates serious injuries and fatal accidents in the tunnel construction. Detailed stipulations on accident prevention and accident coping in construction of superlong underwater shieldbored tunnels are provided. The paper can provide reference for other largediameter underwater shieldbored tunnels in the future.
Key words: Shiziyang tunnel, largediameter slurry shield, risk factor analysis, risk control
ZHENG Qingjun. Risk Factor Analysis and Countermeasures for Shield Tunneling: Case Study on Shiziyang Tunnel[J]. Tunnel Construction, 2011, 31(5): 605-609.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I5/605