Tunnel Construction ›› 2014, Vol. 34 ›› Issue (10): 997-1000.DOI: 10.3973/j.issn.1672-741X.2014.10.012
Previous Articles Next Articles
YANG Bin
Received:
Revised:
Online:
Published:
Abstract:
Singleshield TBMs have been successfully used in many foreign countries, but there are few such cases in China. No. 7 tunnel of Phase I Works of Tao River Division Project in Gansu, China is bored by a singleshield TBM. In the paper, the construction of the tunnel is presented, and conditions for the rapid boring of singleshield TBM are analyzed in terms of geological conditions, equipment, assistant measures and construction organization.
Key words: singleshield TBM, rapid boring, engineering geological condition, equipment, assistant measure, construction organization
CLC Number:
U 45
YANG Bin. Analysis on Conditions for Rapid Boring of Singleshield TBM[J]. Tunnel Construction, 2014, 34(10): 997-1000.